Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 21,2000 PSA#2584

Fleet And Industrial Supply Center Seal Beach Detachment, Naval Weapons Station, Supply Dept., Bldg. 239, Code 210J, 800 Seal Beach Blvd., Seal Beach, CA 90740

41 -- REPLACE EXISTING AIR CONDITIONING SYSTEM WITH NEW SYSTEM SOL N00244-00-T-0607 DUE 042600 POC Toni D. Duenas-Ignacio, Contract Specialist (562) 626-7366 Fax: (562) 626-7479 WEB: Click here to get more information about FISC, San, http://www.sd.fisc.navy.mil. E-MAIL: Click here to contact contracting officer via e-mail, duenasignacio.antoni@sbeach.navy.mil. This action was initially synopsized in the CBD on March 3, 2000. Notice is modified to furnish Clarification for Contractor Questions and Extend Closing Date. Q1: Will new ducting be required? A1: No new ducting will be required. However, ventilation grills are in need of replacement. Q2. Is hot-dipped galvanizing required? A2: Yes, hot-dipped galvanized is required on all outside coverings of all newly installed units due to heavy salt air environment. Q3: What is current tonnage of the equipment van? A3: Van #1 is currently a 3 ton unit. Van #2 is currently a 4 ton unit. Van #3 is currently a 4 ton unit. Van 2 and 3 units sizes are inadequate for current and future cooling requirements. Q4: What is the required equipment and ambient temperature required for all three vans? A4: The equipment temperature was measured at 75 degrees Fahrenheit ( F) while the ambient temperature was measured at 55 F. Equipment should be cooled to 68 F. It was determined by the site survey that the cool air needed to havegreater pressurization to improve flow. Also ventilation grills need the addition of flow control as well as direction control. Q5: What is the minimum difference in height between the false ceiling and the roof in each van? A5: The ceiling height between the false ceiling tiles and the roof was measured as the following: Van #1, 7 1/2 inches; Van #2, 13 inches; Van #3, 7 1/2 inches Q6: Is three-phase 208 VAC, 60 Hz power available? A6: All three vans have three-phase 208 VAC, 60 Hz power available. The revised closing date is COB April 26, 2000. Anticipated award date is May 4, 2000. Posted 04/19/00 (W-SN446730). (0110)

Loren Data Corp. http://www.ld.com (SYN# 0234 20000421\41-0001.SOL)


41 - Refrigeration, Air Condition and Air Circulating Equipment Index Page