|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 25,2000 PSA#2586DISA/DITCO/DTS31, 2300 East Drive, Scott AFB, IL 62225-5406 D -- THIS IS A CORRECTION TO A PREVIOUS ANNOUNCEMENT -- MAINFRAME
COMPUTING SERVICES DUE 050200 POC Contracting Officer, Tom Anson,
618-229-9727, ansont@scott.disa.mil The response date has been extended
one day to 5/2/00 and the text has been changed to read: DISA WESTHEM
is SEEKING INFORMATION FOR PLANNING PURPOSES from potential sources who
may be interested in providing MVS capacity on demand at the DISA
facility at Defense Megacenter (DMC) Mechanicsburg, PA. A key element
of this RFI is that DISA would pay based upon CPU usage. It is the
Government's intent to pay based only upon the capacity actually
consumed, in a manner comparable to payments made to an electric
utility for energy actually consumed. Prospective contractors would
provide services similar to those currently obtained from an IBM R-95
Mainframe CPU at DMC Mechanicsburg, PA. Additional host computers may
be configured in this requirement. The contractor will provide all
equipment to meet the processing loads described below. The DMC's
current capacity requirements are characterized as follows: an average
of 244 MIPS used each month; weekday average of 303 MIPS; the highest
5 hours of each weekday averages 381 MIPS; peak of 397 MIPS for
approximately 10 hours per month; 397 MIPS in at least one 15 minute
interval in 110 hours out of 552 weekday hours per month. The DMC's
capacity on demand requirements are characterized as follows:
nondisruptive capacity upgrade on demand; support for unprogrammed
mission growth estimated to be 10% per year. Current response time
requirements are: one (1) second average for TSO, 3 second maximum for
TSO, 0.2 second average for CICS, one second maximum for CICS, 4
second average for Datacomm, 10 second maximum for Datacomm; this may
be tailored by the vendor. DISA proposes making payments based upon
measured actual consumption by using System Management Facility (SMF)
type 30 and type 110 records, along with Resource Measurement Facility
(RMF) type 70 records. Note -- these record types will not provide the
TSO or Datacomm response time figures. An alternative payment schema
may be proposed by the vendor. All questions and/or comments should be
directed to the Contracting Officer. Posted 04/21/00 (W-SN447517).
(0112) Loren Data Corp. http://www.ld.com (SYN# 0020 20000425\D-0005.SOL)
D - Automatic Data Processing and Telecommunication Services Index Page
|
|