|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 26,2000 PSA#2587USDA-Forest Service, Pacific Northwest Region, Okanogan National
Forest, 1240 S. Second Ave., Okanogan, WA 98840 Y -- CONSTRUCTION AND RECONSTRUCTION OF NOISY CAMPGROUND SOL
RFP-R6-8-00-15 POC Rita M. Robson Procurement Assistant 509-826-3392
E-MAIL: rrobson@fs.fed.us, rrobson@fs.fed.us. NOISY CREEK CAMPGROUND --
The Colville National Forest is seeking proposals for reconstruction
and construction activities for Noisy Creek and Cresent Lake
Campground. This project is a HUB-zone set aside and proposals will be
considered only from Small Business Administration (SBA) certified
HUB-zone contractors. For more information contact the SBA at
www.sba.gov/hubzone Base Items, Noisy Creek CG: 1) Road reconstruction
to improve site drainage and access to and through the campgrounds. 2)
Construction of new, and reconstruction of existing parking areas
adjacent to the boat launch. 3) Installation of four Government
furnished precast concrete toilet buildings of barrier-free design. 4)
Construction of new camping area (20 sites, including one host site)
with new picnic tables and fire rings at each site. 5) Removal of
existing picnic tables and campfire rings associated with existing
campsites that are to be obliterated. 6) Obliteration of a portion of
the existing camping loop roads and spurs. 7) Reconstruction or
construction of trails to facilities to be barrier-free. 8)
Installation of a new water distribution system throughout the new
campground area, including well drilling. 9) Paving with hot mix
asphalt. 10) Road signs and road closure gates. 11) Installation of
bulletin boards. 12) Installation of electrical service to the host
site and fee collection site. 13) Installation of prefabricated steel
road bridge. 14) Installation of a treated timber trail bridge. Option
items, Crescent Lake CG: 1) Installation of one Government furnished
precast concrete toilet building of barrier-free design. 2)
Installation of new picnic tables and fire rings at three campsites. 3)
Installation of one bulletin board. Project Location: The elevation of
the project areas range from about 2,000 to 2,100 feet. Noisy Creek
Campground: From Spokane, WA, travel east on US Highway 2, to the
junction with SR211. At this junction, turn north on SR 211 and travel
to Usk, WA. At Usk, travel north on SR 20 along the Pend Oreille River
to Tiger. At Tiger, continue traveling north on SR 31 along the Pend
Oreille River. Travel approximately four miles north to County Road
9345 (just south of Ione, WA). Turn east on this road and cross the
Pend Oreille River via the orange steel bridge. At the east end of the
bridge (crossing the Pend Oreille River), continue northeast on County
Road 9345 towards Sullivan Lake. Noisy Creek Campground is located at
the south end of Sullivan Lake. Crescent Lake Campground: Same as
above, but once on SR 31, travel through Ione to Metaline Falls. Travel
through Metaline Falls towards the USA/Canada border. The project is
located adjacent to SR 31 about one mile south of the USA/Canada
border. For additional site information contact Lou Janke at
509-684-7230. The estimated cost of construction for campground work is
$100,000- $500,000. The contract time is July 5, 2000 through November
5, 2000. A formal site visit will be conducted on May 25, 2000 at 1 pm
at the Noisy Creek Campground project site. Performance or Payment
Bonds are required, 100% Performance Bond and 50% Payment Bond of
awarded penal sum. For solicitation copies contact Rita Robson
509-826-3392 fax requests to 509-826-3064. All responsible sources may
submit an offer which will be considered. See Numbered Note 27. Posted
04/22/00 (W-SN447750). (0113) Loren Data Corp. http://www.ld.com (SYN# 0094 20000426\Y-0010.SOL)
Y - Construction of Structures and Facilities Index Page
|
|