Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 27,2000 PSA#2588

United States Property and Fiscal Office, P.O. Box 40748, Powell Avenue, Nashville, TN 37204-0748

Y -- CONSTRUCT KC135 HYDRANT FUELING SYSTEM SOL DAHA40-00-B-0001 DUE 062100 POC Barry Baxter, 615-313-2654 or CPT Sammy Beard, 615-313-2650 E-MAIL: Click here to contact the Contract Specialist via, baxterbl@tn-arng.ngb.army.mil. The United States Property & Fiscal Office for Tennessee has a requirement to construct a KC-135 Aircraft Hydrant Fueling System for the Tennessee Air National Guard, McGhee Tyson ANG Base, Knoxville, Tennessee. Work includes providing all labor, materials, equipment, incidentals, and perform all work as required to construct a new 3,750 SF POL pumphouse facility for a Type III aircraft hydrant refueling system complete with pumps, controls, and underground piping tie-ins to the existing fuel storage tanks and the eight (8) each hydrant pits in the aircraft parking apron. The hydrant pits are being furnished and installed by others as part of the aircraft parking apron currently under construction. The new POL pumphouse will be fully integrated into the existing POL facility. New underground POL lines will be required to connect existing hydrant piping loop under apron with the new pumphouse. Contractor will be required to make the new Type III hydrant system complete and fully operational. Modifications, repairs, and inspections of tanks and other equipment to remain will be required at the POL tank farm. Construction will include demolition of a small concrete block building and all above ground piping and associated equipment, including deactivation and abandonment of underground POL piping and seven (7) existing in-slab fuel hydrant pits north of project site. Other demolition work includes asphalt/concrete pavement removal, including underground and above ground utility lines in some areas. New construction/site improvement work also includes the relocation of a two-lane bi-directional road for the southwest end of the base, mass grading and earthwork operations, and storm drainage collection and detention. Other site improvements consist of upgrading and relocating government owned underground water, electric, natural gas, and communications utility lines. Other new construction work includes new permanent chain link security fencing and new apron pole lighting. Lawn seeding of all new finished grade work is required. Contractor will be required to provide gate security within and external to the project site for the duration of the contract and in accordance with Metropolitan Knoxville Airport Authority and Air National Guard security regulations. Magnitude of construction is between $5,000,000 and $10,000,000. Solicitation documents to include plans and specifications will be available o/a 17 May 00 with bid opening occurring o/a 21 Jun 00. Documents may be obtained by remitting a certified check or money order (NO COMPANY CHECKS)(NON-REFUNDABLE)in the amount of $275.00 made payable to the US Treasury. This solicitation will be issued unrestricted therefore bids will be accepted from small as well as large business firms. Be advised that contractors seeking award of Department of Defense contracts must be registered in the Central Contractor Registration (CCR) database prior to award. Information on CCR is available at http://www.ccr2000.com Posted 04/25/00 (W-SN448554). (0116)

Loren Data Corp. http://www.ld.com (SYN# 0130 20000427\Y-0013.SOL)


Y - Construction of Structures and Facilities Index Page