COMMERCE BUSINESS DAILY ISSUE OF APRIL 28,2000 PSA#2589U.S. Department of Justice, Procurement Services Staff, National Place,
Suite 1040, 1331 Pennsylvania Avenue, NW, Washington, DC 20530 Z -- MECHANICAL UPGRADES TO BUILDING SYSTEMS SOL SOL-DOJ-FAS-0-01-014
DUE 052500 POC Please contact Ms.PAM RHAME 202.305.8429 Mechanical --
Scope of Work (SOW): MAIN JUSTICE BUILDING -- Interim Construction 950
Pa. Ave., NW, Wash., DC 20530-0001 1. Room 1345 -- Remove existing
ceiling hung A/C unit (FC-7) and return to the Government for storage,
install new ceiling hung A/C unit (FC-13) -- provided by the
Government, with all associated piping. Provide and install duct work,
two (2) 24X24 perforated face supply and return air grilles, including
insulation. Balance air and water flow. 2. CAO: Room 2341 -- Remove
existing A/C unit (FC-3) and return to the Government for storage.
Install new A/C unit (FC-5), change top grille to match with new fan
coil unit, (Grille and FC-5 will be provided by the Government) and
ensure chilled water line is 25mm. Balance water flow. 3. OPR: Room
3415 -- Furnish and install two (2) ton floor mounted chilled water
Liebert A/C unit for computer room, 25mm chilled water lines and 32mm
condensate drain line and insulation. Circuit the A/C unit to dedicated
circuit in the attic panel for 24 hours of operation. Provide core
drill hole through floor for piping to allow for connection to supply
and drain below. 4. AG Kitchen: Room 5611 -- Replace 20mm chilled water
lines with 25mm. Balance water flow. AG Dinning Room: Room5607 &
5609 -- Install new Government provided ceiling hung A/C(FC-12),
provide and install new 20mm chilled water lines, 32mm condensate drain
line, supply and return air grilles, including all insulation. Provide
and install air duct, fire damper, volume damper, thermostat and
diffusers as indicated on drawing. Balance air and water flow. Circuit
all four (4) fan coil units to dedicated circuit in the attic panel
for 24 hours of operation. Remove and reinstall exhaust fan and hood,
duct work, louver as indicated on drawing. Provide power and fan
switch. Provide and install rough-in for a sink, garbage disposal and
dishwasher, including required shutoff valves. ( see attached drawing
for layout). Provide and install 10 gallon electric water heater
underthe counter. Install all the piping and valves as shown on
drawing. Remove and relocate ice maker and all associated components.
5. DJRA: Remove two (2) fan coil units (FC-2) and return to the
Government for storage and install two (2) new Government provided fan
coil units (FC-4), with new enclosure provided by government, upsize
chilled water lines from 20mm to 25mm. Remove one (1) fan coil unit
(FC-2) and return to the Government for storage and install one (1) new
Government provided fan coil unit (FC-3). Circuit these three (3) fan
coils to dedicated circuit in the attic panel for 24 hours operation.
Balance the water flow. Provide & install sink and all plumbing
piping, valves, refer to drawing for more details. Plumbing must be
done before or concurrent with AG kitchen project due to cross
connection. 6. Travel Office: Room 1420A -- Remove existing ceiling
hung A/C unit (FC-6) and return to the government for storage, and
install new Government provided ceiling hung A/C unit (FC-7). Furnish
& install one additional supply air diffuser and air duct as
indicated on drawing. Provide and install one 10" X 6" acoustical sound
lined Z-duct . Balance air and water flow. 7. JMD/Exec. Secretariat:
Room 1410 -- Install additional air diffuser with associated duct work.
Balance air flow. 8. OSG: Room 5143 -- Remove two (2) existing fan coil
units (FC-3) and return to the Government for storage; replace with two
(2) new Government provided (FC-5) as indicated on drawing,. Adjust the
support legs of fan coils so that air filter can be removed through
front cover grilles. Circuit the three (3) fan coils to dedicated
circuit in the attic panel for 24 hours operation. Replace thermostats
with new 3 speed/OFF fan thermostat, provided by the Government.
Rooms: 5149 and 5603 -- Connect fan coil units to dedicated circuit in
the attic panel for 24 hours circuit operation. The new circuit for
rooms 5143, 5149 and 5603 is 5HPM4-8. 9. FBI Details: Rooms 5614, 5616
and 5618 -- Connect fan coil units to dedicated circuit in the attic
panel for 24 hour operation. The new circuit for rooms 5614, 5616 and
5618 is 5HPM7-26. Note(s): -- Contractor is required to furnish and
install new material throughout the project unless noted in this SOW or
with written notice from the contracting officer. -- All work must meet
excepted industry standards in accordance with applicable local and
national codes. -- All supply & condensate lines must be insulated
as is the building standard [typical throughout the building]. -- All
material, installation and workmanship must follow the existing
contract specification. [The contract specification will be provided
for reference]. -- The contractor shall be responsible for all damage
caused in the performance of his/her work. -- The contractor is
responsible for providing all equipment necessary to perform his/her
work. -- The work in this area can be accomplished between the hours of
7:00 AM and 4:00 PM, Monday thru Friday. Authorization to work outside
of these hours must be obtained from the contracting officer. -- The
work site is in an area under renovation, therefore, workers are
required to wear appropriate safety attire meeting applicable OSHA
standards. -- The contractor and/or his/her agents are responsible for
protecting all flooring, walls, doorways, etc. in the work area, as
well as those areas immediately adjacent to the work area. All debris
must be removed from the building at the end of each work day; there is
no on-site dumpster facilities available. -- The Main Justice Building
is a secure facility. The contractor will be required to submit the
names, dates of birth and social security numbers of their staff prior
to gaining access to the facility. No on-site parking will be
provided, although contractor(s) will have limited access to the
building to off load supplies. -- Work in this order is covered under
the Davis-Bacon Act. Prevailing wage rates must be paid. -- A MANDATORY
site visit is schedule for Thursday, May 18, 2000 at 1:00 PM for
interested vendors to tour the site. [This site is in a construction
zone. Attendees will be required to bring and wear hard hats]. Please
provide a list of attendees and your company name indicating your
intent to attend this meeting, via fax, by noon on May 15, 2000. Please
address your fax to Ms. Rhame on 202.307.1915. Drawings, clauses
[pertaining to this construction purchase order] and the appropritate
Dept. of Labor wage determination will be provided. -- Contractor's
submittal package must include a detailed cost quotation, description
of previous experience on a minimum of three similar projects and the
names, addresses and current telephone numbers of at least three
references. As the Deparmtent of Justice has an urgent need to have
this work accomplished, quotes are due by close of business on May 25,
2000 with an anticipated award date of May 30, 2000. The successful
vendor will be expected to immediately begin performance. -- Drawings
and assistance will be provided by Mr. Chau Tran, a Department of
Justice engineer. Mr. Tran will be available at the on-site field
office should clarification be needed. -- The equipment and material
shall be consistent with all installed in Phase I area of the on-going
modernization project of the MAIN Justice Building, assistance will be
provided to select equipment and manufactures as needed by Mr.
Tran.***** (3) Posted 04/26/00 (W-SN448715). (0117) Loren Data Corp. http://www.ld.com (SYN# 0117 20000428\Z-0011.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|