Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 1,2000 PSA#2590

Department of the Air Force, Air Mobility Command, 43rd CONS, 1443 Reilly Rd, Suite C, Pope AFB, NC, 28308-2896

P -- DEMOLISH ADMINISTRATION OFFICES INSIDE HANGAR 5 OF BUILDING 708 LOCATED AT POPE AFB, NC. SOL F31601-00-T0291 DUE 050800 POC Marie Becton, Contract Specialist, Phone (910) 394-6281, Fax (910) 394-6289, Email marie.becton@pope.af.mil -- Tommie Miller, Contracting Officer, Phone (910) 394-6284, Fax (910) 394-6289, Email WEB: Visit this URL for the latest information about this, http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=M&ProjID=F31601-00-T0291&LocID=534. E-MAIL: Marie Becton, marie.becton@pope.af.mil. The purpose of this modification is to advise that the following questions have been asked concerning the existing concrete floor in Hangar 5: (1) How was the concrete slab in Hangar 5 constructed? (2) What is the thickness of the slab? (3) Did they put a four (4) inch slab on top of the existing concrete floor? (4) Is there a bond breaker between existing concrete and the four inch slab? (5) Were dowels inserted into the existing concrete? (6) Are dowels sticking up? (7) Any steel reinforcement(s)? We inquired of Civil Engineers POC and were informed that there are no drawings or documentation that show how the slab was poured on the existing hangar floor. The only drawings that exist are already included in the bid package. Bidders may have to use their best judgments on how the slab was constructed. Bid date has been extended to 08 May 2000. All proposals are due in to this office by 1615, 08 May 2000. Posted 04/27/00 (D-SN449441). (0118)

Loren Data Corp. http://www.ld.com (SYN# 0074 20000501\P-0002.SOL)


P - Salvage Services Index Page