|
COMMERCE BUSINESS DAILY ISSUE OF MAY 2,2000 PSA#2591NASA/Goddard Space Flight Center, Code 210, Greenbelt, MD 20771 A -- 2 MONTH EXTENSION TO CONTRACT NAS5-31760 FOR SPECIALIZED
SCIENTIFIC AND TECHNICAL SUPPORT SOL RFP5-62094-258 DUE 051500 POC
CAROLYN S GONSER, CONTRACTING OFFICER, Phone (301) 614-5585, Fax (301)
614-5619, Email cgonser@pop200.gsfc.nasa.gov WEB: Click here for the
latest information about this notice,
http://nais.msfc.nasa.gov/cgi-bin/EPS/bizops.cgi?gr=D&pin=51#RFP5-
62094-258. E-MAIL: CAROLYN S GONSER, cgonser@pop200.gsfc.nasa.gov.
NASA/GSFC plans to issue a Request for Proposal (RFP5-62094-258) on a
sole source basis to Raytheon STX Corporation pursuant to 10 USC
2304(c)(1)-Only One Responsible Source. This procurement will extend
the period of performance under Contract NAS5-31760 for an additional
2-month extension. The extension period will be from July 1, 2000
through August 31, 2000. This extension is required to : 1) meet
critical milestones within the Laboratory for Terrestrial Physics; and
2) to allow for the consolidation of efforts with similar requirements
within the Earth Sciences Directorate for the purpose of competition.
This procurement is a continuation of specific specialized scientific
and technical support which Raytheon STX provides to the Laboratory of
Terrestrial Physics to advance NASA programs by promoting the increase
in scientific knowledge of the Earth and planetary solid-body physics.
The Laboratory for Terrestrial Physics is committed to specific and
critical milestones regarding the delivery and/processing of scientific
data, software, scientific analysis tools, and computer resources
during the period from July 1, 2000 through August 31, 2000. It is not
feasible to conduct a competitive solicitation prior to the expiration
of the proposed extension without causing unacceptable delays to the
affected missions/programs. These critical milestones include, but are
not limited to: 1) in-flight calibration of the magnetometer and
production of a joint main field model for the Oersted mission; 2)
Phase II global gravity field model development as a joint effort
between GSFC and DoD; 3) software simulations for the launch for the
Shuttle Laser Altimeter-3; 4) calibration of altimetry data from TOPEX
and Geosat follow-on launches including the analysis of the
post-launch data; and 5) completion of arc tie capability in SOLVE
software; the time dependent gravity effort is waiting for this
feature. The support sought during this extension is a continuation of
the work performed by Raytheon STX, under this contract, and is only
intended to continue until follow-on contracts are competitively
awarded. The statutory authority for this sole source procurement is 10
USC 2304(c)(1)-Only One responsible source. However, companies who
believe they can provide these services without any detrimental impact
to program schedules supported by this work, should identify their
interest and capabilities within 15 days after publication of this
synopsis. See Number Note (s): 22. Interested firms have 15 days from
publication of this synopsis to submit in writing to the identified
point of contact, their qualifications/capabilities. Such
qualifications/capabilities will be used solely for the purpose of
determining whether or not to conduct this procurement on a competitive
basis. Responses receive after the 15 days or without the required
information will be considered nonresponsive to the synopsis and will
not be considered. A determination by the Government to not compete the
proposed effort on a full and open competitive basis, based upon
responses to this notice is solely within the discretion of the
Government. An Ombudsman has been appointed. See Internet Note "B".
Posted 04/28/00 (D-SN449839). (0119) Loren Data Corp. http://www.ld.com (SYN# 0002 20000502\A-0002.SOL)
A - Research and Development Index Page
|
|