Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 3,2000 PSA#2592

General Services Administration, 401 W Peachtree Street, Suite 2400, 4PMB, Atlanta, GA 30365-2550

N -- INSTALLATION OF GOVERNMENT FURNISHED EMERGENCY GENERATOR AT THE INS FIRING RANGE IN ALTOONA, PA SOL GS-04P-00-EWM-0067 DUE 060100 POC Victoria Longacre (404) 331-9788 E-MAIL: click here for email to the Point of Contact, VickieA.Longacre@gsa.gov. Provide all plant, labor, equipment, appliances and materials to install a GOVERNMENT Furnished 150 KW Emergency Generator (genset), Remote Enunciator, and Fuel Storage Day Tank that will be used to provide continued backup power to the National Firearms Unit (NFU). The contractor shall provide and install an Automatic Transfer Switch w/Bypass (ATS) with full load exerciser, sized accordingly and connected up to building sub-station and genset. The work shall include installation of a 150 KW genset with weather protective enclosure, remote enunciator, an automatic transfer switch (ATS), full load exerciser clock, remote hour meter, fuel piping, electrical conduit and wiring, new concrete slabs, and fuel storage day tank, and writing the genset to substation seondary output, and the existing main distribution panelboard with the ATS. The cast in place concrete pads for the genset and daytank shall be formed and poured according to manufacturer's recommendations. The contractor shall perform preventativemaintenance on genset prior to start up which will include flushing out all fuel lines, changing oil, and replacing fuel and oil filters. The contractor shall run a full load test of the genset for satisfactory operation. The contractor shall provide and install and Automatic Transfer Switch w/BYpass located near the genset as per drawings. The contractor shall provide and install a full load exerciser clock near the remote enunciator, wired to carry full load of facility when in the test position. All work required for the installation of the generator and appurtenances and the interface with the existing site distribution system will be coordinated with the National Firearms Unit Agent-in-Charge through the Contracting Officer. All work shall be in strict accordance with the specifications and with local codes and regulations. The contractor shall employ the services of an manufacturer representative to conduct all start up and load test. The contractor shall top off fuel tanks with diesel fuel prior to start-up. Posted 05/01/00 (W-SN450022). (0122)

Loren Data Corp. http://www.ld.com (SYN# 0045 20000503\N-0001.SOL)


N - Installation of Equipment Index Page