Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 5,2000 PSA#2594

1822 Van Patton Wright-Patterson AFB Oh, 45433

Y -- AIRCRAFT MAINTENANCE UNIT SHELTER MOD PROJECT SOL F33657-00-R-0009 DUE 050800 POC EARLE D. MUNDELL,JOHN K. BACK, DON TATMAN,937-257-7298 xt. 4083 WEB: 00R0009WP-AIRCRAFT MAINTENANCE UNIT SHELTER MOD PROJECT, http://www.pixs.wpafb.af.mil/pixslibr/00R0009WP/00R0009WP.asp. E-MAIL: earle.mundell@wpafb.af.mil, john.back@wpafb.af.mil,, earle.mundell@wpafb.af.mil, john.back@wpafb.af.mil, michael.beach@wpafb.af.mil. Background "A requirement exists on King Fahad Air Base, Taif Kingdom of Saudi Arabia (KSA) to provide materials, equipment and labor necessary for the design and modification of specific areas in three (3) existing aircraft shelter (Dummy Shelter [DS] -7, Group Shelter [GS]-7 and GS-10) for the activation of the 65th Aircraft Maintenance Unit at KfdAB Taif, KSA. These requirements are to be reviewed by each contractor during the site visit. A site will be arranged within three weeks of the date from issuance of a Request for Proposal (RFP). Each contractor must confirm any measurements, quantities, shapes, locations, or sizes during the visit. The contractor shall coordinate all work with the RSAF to minimize disruption to the mission. Weekend work, defined as Thursdays and Fridays, may be required in order to minimize disruptions. Any weekend work must be scheduled, coordinated with RSAF Base O&M, Security and the Contracting officer's Technical Representative (COTR), and must have the prior approval of the Administrative Contracting Officer (ACO). The contractor performance period will not exceed 160 days following Notice to Proceed (NTP). All items provided by the contractor will include the applicable manufacturer's warranty and contract warranties for not less than one year. " Posted 05/03/00 (D-SN451050). (0124)

Loren Data Corp. http://www.ld.com (SYN# 0122 20000505\Y-0009.SOL)


Y - Construction of Structures and Facilities Index Page