|
COMMERCE BUSINESS DAILY ISSUE OF MAY 9,2000 PSA#2596H -- CLEAN, INSPECT, AND TEST WELL, TO INCLUDE PUMP AND MOTOR. 1.
Remove vertical turbine pump. Perform closed circuit television
inspection of well including casing and screened interval. Determine
appropriate method to clean and rehabilitate well. Provide a written
report and cost estimate detailing work needed to clean and
rehabilitate well. 2. Disassemble, clean, and inspect vertical turbine
pump including all components (i.e. pump riser, pump shafts, shaft
couplings, and impellers). Provide a written report and cost estimate
detailing required parts and repairs. 3. Clean, inpsect, and test 60 HP
electric motor. Provide a written report and cost estimate detailing
condition and identifying any parts needed for repair. WEB: Visit this
URL for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=S&ProjID=F65503-00-T03
12&LocID=645. E-MAIL: David Bales, david.bales@eielson.af.mil. Posted
05/05/00 (D-SN452115). Loren Data Corp. http://www.ld.com (SYN# 0463 20000509\SP-0006.MSC)
SP - Special Notices Index Page
|
|