COMMERCE BUSINESS DAILY ISSUE OF MAY 12,2000 PSA#2599Tahoe National Forest, 631 Coyote Street, Nevada City, Ca 95959-2250 Y -- BOWMAN ROAD REPAIRS, NEVADA CITY RANGER DISTRICT SOL RFQ-17-00-36
DUE 071400 POC Tahoe National Forest, Fax Machine 530-478-6126 Bowman
Road repair consists of repairing the washed out roadway, replacing the
aggregate, asphalt, and rip rap. The rip rap will be held in place with
a concrete slurry. The large gravel bar blocking the inlet of the
existing C.M.P. will be pushed to the sides so the stream channel flows
directly to the pipe inlet. At site 2, install a new C.M.P. Install
gabions in wash, compact backfill and reconstruct 18 foot roadbed
through the curve. At site 3, pour concrete under the North East wing
wall of the Canyon Creek Bridge. Install2 new C.M.P.'s in the new
stream overflow wash. Reconstruct and compact the new 16 foot roadbed
over the new pipes and through the washout area. The project is
location from Nevada City, travel Northeast on Hiway 20 for 22 miles to
Bowman Road. Price range $25,000 to $100,000. Solicitation issue date
approximately 06/12/00. Start work date 07/31/00, contract time 80
days. Payment bonding required. Posted 05/10/00 (W-SN453514). (0131) Loren Data Corp. http://www.ld.com (SYN# 0113 20000512\Y-0002.SOL)