COMMERCE BUSINESS DAILY ISSUE OF MAY 15,2000 PSA#2600USAED, Sacramento, Corps of Engineers, Contracting Division, 1325 J
Street, Sacramento, CA 95814-2922 Y -- 130 CORROSION CONTROL FACILITY, USAF, HILL AFB, UTAH SOL
DACA05-00-R-0018 DUE 070700 POC Thomas Hart (916) 557-5208 PROJECT
TITLE: C-130 CORROSION CONTROL FACILITY, USAF, HILL AIR FORCE BASE,
UTAH. JOB DESCRIPTION: Design and construct a new three-bay C-130
Corrosion Control Facility of approximately 6,900 M2 located near the
flight line at Hill Air Force Base. The facility's primary function
will be to provide an environmentally safe facility to perform
depot-level corrosion control on C-130 and smaller aircraft. The
facility will support the periodic depot maintenance as well as the
annual recurring drop-in C-130 aircraft and incl8udes a bay each for
de-painting (striping), washing, and painting. The project will meet
the criteria/scope specified in the Air Force Handbook 32-1084. The
structure will be permanent construction. The clear height inside the
bays will be measured to 3,050 mm above the top of tail on the C-130
aircraft. Aircraft access between the existing airfield pavement and
the new facility along with adequate aircraft maneuvering/parking
pavement will be provided. Project includes demolition of Building No.
271, relocation of overhead steam lines and pneumatic lines,
excavation, site work, access and area paving, HVAC, fire protection
(including AFFF), EMCS, all production equipment, worker maneuvering
platform equipment, ventilation equipment, and all necessary featurres
(interior and exterior) to yield a complete and useable facility for
its intended use. The project may include the installation of a
sub-station transformer and related features. The project is located on
andadjacent to the airfield -- - access is controlled and airfield
safety requirements will be in effect. All electronic systems designed
and installed must be Year-2000 and beyond compliant. The project will
be a two-phase design-build project. Phase 1 is the pre-selection phase
resulting in the selection of three Offerors (this phase does not
include the submission of a cost proposal). Only these Offerors will be
allowed to continue to the Phase 2 process. Past performance on
projects of similar nature (similar or greater complexity, cost, scope,
and technical sophistication) will be a major consideration in
selection of the three firms. Phase 2 is the technical & price phase
where the Offerors develop and submit the project definition design
(equivalent to 10% of the design effort) for the project along with a
cost proposal. The Offeror chosen will complete the design and
construct the facility. The acquisition method so negotiated
procurement. Evaluation by the Government will result in selection of
a firm that represents the best advantage to the Government. The
procurement will be conducted under SIC CODE 1542. The size standaard
for this SIC CODE is $17,000,000.00. A stipend program will be made
available to the two unsuccessful proposers; at an equal rate of
payment of not to exceed $50,000.00. Participation in the stipend
program will result in Government ownership of the Phase-2 Proposal and
related design sosluctions. The Design-Build Contractor will be
required to perform a geotechnical investigation yielding a
geotechnical report that will be used as a basis for design. Likewise,
the D-B Contractor will be required to perform a topographical survey;
also a basis for design. Following selection, the contract will proceed
as follows: The design and construction will be phased with
pre-selected aspects of the design being completed with Government
review/comment before the related construction begins. Therefore, after
construction begins, both design and construction will be occurring
simultaneously until all design is complete. ORDERING PLANS AND
SPECIFICATIONS: PLANS AND SPECIFICATIONS FOR THIS PROJECT MUST BE
ORDERED BY THE cut off date of MAY 25, 2000. Plans and Specifications
can only be ordered electronically by accessing Internet Address
http://ebs.spk.usace.army.mil/ Please complete the requested
information to avoid a delay in your order. Orders received beyond the
CUT OFF DATE of May 25, 2000, will not be honored. Plans and
Specifications will be mailed out on or about June 1, 2000. Because a
limited number of sets will be produced, copies are limited to one set
per firm. All responsible sources may submit a Bid of Proposal, which
will be considered by the Agency. See Note 26 (See Commerce Business
Daily, Monday Edition). For a lis;ting of all Sacramento District
Projects, see Contracting Division's Internet Home Page at
http://ebs.spk.usace.army.mil/ and potential Contractors must be
registered with the Central Contractor Registration (CCR). Please see
our Web Page. Posted 05/11/00 (W-SN454071). (0132) Loren Data Corp. http://www.ld.com (SYN# 0138 20000515\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|