Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 8,2000 PSA#2617

U.S. Army Corps of Engineers, Jacksonville District, P.O. Box 4970, Jacksonville, Florida 32232-0019

Y -- WESTERN C-11 BASIN PHASE 1, PUMPING STATION 9A, CRITICAL RESTORATION PROJECT, CENTRAL AND SOUTHERN FLORIDA ECOSYSTEM SOL DACW17-00-R-0032 DUE 081500 POC Kathie B. Duke, 904-232-3713 WEB: Business Opportunities, http://www.saj.usace.usace.army.mil. E-MAIL: Click here to contact the Contract Specialist, Kathleen.B.Duke@usace.army.mil. Y -- Phase 1 of the Western C-11 project consists of the construction of Pumping Station S-9A, which will serve to back-pump clean seepage water that has been isolated from urban and farm runoff into Water Conservation Area 3A. In the second phase of the project, a divide structure will be constructed east of the pumping station to prevent C-11 flows from moving west toward the pumping station. The pumping station is located adjacent to the existing Pumping Station S-9 approximately 1/2 mile west of U.S. Highway 27 at the intersection of the C-11 canal in Broward County, Florida. The project consists of construction of the substructure and superstructure, providing pumping units, providing the pumping station auxiliary equipment (including electronic controls for the engines and motors), an emergency generator, fuel piping and monitoring, relocation of a domestic water well, earthwork adjacent to the pumping station, and miscellaneous retaining walls. The construction of Pumping Station 9A includes the following: (a) The installation of two 175 cubic feet per second (cfs) pumps and two 75 cfs pumps. All pumps will be vertical impeller types. Two of the pumps will be driven by diesel engines through a right angle speed reducer. Two of the pumps will be driven directly by electric motors; (b) Equipment for the pumping station will include, but not be limited to, a trash rake, a bridge crane, and a standby generator; (c) Construction of the pumping station will include, but not be limited to, the station substructure, a fully enclosed building for the equipment, one access bridge, trash racks, and related civil works; (d) Other construction will include, but not be limited to, the pumping station approach and discharge channels. The approach channel will consist of a trapezoidal channel having a bottom width near the pumping station of approximately 50 feet and an invert near the pumping station of -13.5 feet, NGVD. The existing ground surface elevation in the vicinity of Pumping Station 9A is approximately 8.0 feet, NGVD. PROPOSAL REQUIREMENTS: Proposals will be evaluated and rated on the following factors: Past Performance and Price. This is a competitive best value Source Selection in which the offerors performance history is approximately equal to price. Magnitude of construction is $5,000,000 to $10,000,000. Invitation for Bid DACW17-00-R-0032 will be issued on or about 23 Jun 2000 and open on or about 15 August 2000. Solicitation will be issued in electronic format only. Bidders will be provided a CD ROM at no cost. Interested offerors must register electronically. The registration form is located at http://www.saj.usae.army.mil/. (Select Business Opportunities). THIS IS AN UNRESTRICTED ACQUISITION. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call 1-888-227-2423 for more information or . SIC Code 1629, size standard $17 Million. Posted 06/06/00 (W-SN462072). (0158)

Loren Data Corp. http://www.ld.com (SYN# 0103 20000608\Y-0004.SOL)


Y - Construction of Structures and Facilities Index Page