Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 9,2000 PSA#2618

Commander, Southern Division, Naval Facilities Engineering Command, 2155 Eagle Drive, P. O. Box 190010, North Charleston, SC 29419-9010

Z -- REPLACE UNDERGROUND CABLE IN OFFICER'S HOUSING AT NAVAL WEAPONS STATION, GOOSE CREEK, SC SOL N62467-00-B-8277 DUE 062600 POC POC: Lori Chestnut, Contract Administrator 843-764-4112 ext. 3046 WEB: www.esol.navfac.navy.mil, www.esol.navfac.navy.mil. E-MAIL: lloydca@efdsouth.navfac.navy.mil, chestnutlh@efdsouth.navfac.navy.mil. Replace underground electrical cable in officer's housing located at the Naval Weapons Station, Goose Creek, SC. SIC# 1623. Estimated between $100,000 and $200,000. IT IS MANDATORY TO SCHEDULE A SITE VISIT AND CONTRACTOR MUST BE IN THE CENTRAL CONTRACTOR REGISTERATION PRIOR TO SUBMITTING A BID. (SEE WWW.CCR2000.COM) CONTRACTOR'S NOT REGISTERED IN CCR WILL NOT BE CONSIDERED. TO SCHEDULE A SITE VISIT POC: NIKKI BUTLER 843-764-4112 EXT. 3052 OR CALL BEEPER# 888-528-9243. THE WORK INCLUDES FURNISHING ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION FOR 1) Replacement of existing 15 KV primary distribution system components including cables, raceways, and single phase pad mounted transformers. 2) Work shall be completed within 240 calendar days. This includes 15 calendar days to allow for mailing of contract award and submission/approval of required bonds. 3) Liquated damages shal be the sum of $200.00 for each calendar day of delay. 4) The basis of bid shall be lump sum for the entire work, complete. 5) Prepare a computerized critical path method (CPM) schedule that includes proposed engineering, procurement, construction and testing activities. The CPM schedule shall cover the time from contract award/notice to proceed to the contract completion date. The CPM schedule shall incorporate labe, equipment and quantity resource data as well as cost information. The principles and definitions of the terms used herein shall be set forth in AGCA CPS and Contract Clause "FAR 52.236-13, Schedules for Construction Contracts". 6) Contractor shall use the current version of the Sure Trak Software by Primavera Systems, Inc. which shall be capable of operating in a Windows environment. If the contractor chooses to use an equally capable program, the Contractor shall convert all data into Primavera Machine Readable Format (Lotus, D-Base, Excel, etc.) prior to submission of all schedule inputs, including but not limited to the initial schedule, monthly updates, and changes to the schedule. All required network analysis submissions and updates shall be submitted on 3-1/2 inch double sided, high density disks. The disks submittal requirement shall be in addition to any hard copy submittal required. SITE VISITS ARE MANDATORY AND REQUEST OF SOLICITATION PACKAGES MUST BE REQUESTED IN A TIMELY MANNER PRIOR TO THE CLOSING DATE. SOLICITATION PACKAGES ONLY AVAILABLE ELECTRONICALLY. (GO TO WWW.ESOL.NAVFAC.NAVY.MIL) If further information is contact Lori Chestnut 843-764-4112 ext. 3046.***** Posted 06/07/00 (W-SN462296). (0159)

Loren Data Corp. http://www.ld.com (SYN# 0171 20000609\Z-0035.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page