|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 13,2000 PSA#2620Department of the Air Force, Air Mobility Command, 62nd CONS, 100 Main
St. Ste 1049, McChord AFB, WA, 98438 Z -- EC REPAIR BASE SANITARY SEWERS PHASE II AND III SOL
F45603-00-R8015 DUE 080800 POC Lawrence Bucklin, Contract Specialist,
Phone (253) 984-9027, Fax (253) 984-5053, Email
Lawrence.Bucklin@mcchord.af.mil -- Harry Goodchild, Contract
Specialist, Phone (253) 984-3878, Fax (253) 984-5053, Email WEB: Visit
this URL for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F45603-00-R80
15&LocID=683. E-MAIL: Lawrence Bucklin,
Lawrence.Bucklin@mcchord.af.mil. The work shall consist of furnishing
all plant, labor, equipment, materials and supervision to complete
construction work under Projects PQWY 98-1020B & C entitled EC Repair
Base Sanitary Sewers Phase II and III, respectively, at McChord AFB
Washington. These projects involve, but are not limited to, the
following: (1) repair/replacement of sanitary sewer piping system (both
gravity and force main) to include low pressure pump stations, (2)
repair and/or replacement of manholes, (3) pre and post construction
video taping of affected piping system and (4) necessary site work to
include excavation, trenching, earthwork, concrete curbing, sidewalks,
gutters, paving and sodding. All work shall be performed according to
the applicable specifications, drawings and provisions of the
resulting contract. The magnitude of construction is between $1,000,000
and $5,000,000. The applicable SIC Code is 1623. In conformance with
FAR 19-1300 this acquisition is being considered for a Hubzone
set-aside. If your firm is Hubzone certified and intends to propose on
this acquisition, please provide the following information to the
Contracting Officer not later than ten (10) days after the publication
of this notice: (1) SBA certification of Hubzone eligibility, (2)
capability statement of your firm, and (3) a positive statement that
your firm intends to propose on this acquisition. Based on response the
Contracting Officer will make a determination; if there is not a
reasonable expectation of adequate competition the acquisition will be
conducted under full and open competition. The period of performance
is 280 calendar days. This solicitation will only be available on
CD-ROM at no charge to contractors/plan centers. Issuance of the
solicitation will be on or about 5 July 2000 with the closing date for
receipt of proposals on or about 8 August 2000. Any and all amendments
to this solicitation will be posted only to the Electronic Posting
System web site at www.eps.gov. Requests for an electronic media copy
(CD-ROM) of the solicitation shall be submitted in writing and mailed
to 62d Contracting Squadron, PO Box 4178, McChord AFB WA 98438-0178 or
via facsimile or e-mail as indicated below. Posted 06/09/00
(D-SN463499). (0161) Loren Data Corp. http://www.ld.com (SYN# 0166 20000613\Z-0040.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|