COMMERCE BUSINESS DAILY ISSUE OF JUNE 19,2000 PSA#2624U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 Y -- HQ AFRC BUILDING 210 RENOVATIONS AND ADDITIONS -- ROBINS AFB,
GEORGIA SOL DACA21-00-R-0028 POC Mr. Jack Bach, 912-652-5796 (Technical
Questions); Ms. Linda Elliott, 912-652-5076 (Contractual Questions)
WEB: Corps of Engineers, Savannah District, Contracting,
http://ebs.sas.usace.army.mil. E-MAIL: Linda G. Elliott,
linda.g.elliott@sas02.usace.army.mil. DESC: The project is a single
phase Design-Build Request for Proposals for space/use planning, design
and construction of approximately 130,000 square feet of renovations
and approximately 25,000 square feet of additions to this facility. The
original 1950s vintage existing masonry building is three story, except
for the East and West Annexes which are two story and added after the
original construction. Portions of the facility have basement areas.
The building function is and will continue to be primarily office and
administrative space. The new construction will consist of the addition
of third floors to the East and West Annexes, and several three story
electrical and mechanical towers for new HVAC, electrical, and
communications equipment and distribution systems. The towers are
located in courtyard areas on the north side of the existing facility.
The existing facility renovations will be extensive, including most
all interior features and systems. Asbestos, lead-based paint and
geotechnical investigations have been performed and reports there of
are included in the RFP. Both structural interior design (SID) and
comprehensive interior design (CID) services (primarily space/use
planning) will be required. Approximately half of the facility
occupants will remain in the facility during construction. Phasing and
sequencing of the work will be required. Presently the options being
considered, in no special order, are: a. Public address system, b.
Landscaping, c. Contractor provision of temporary office space for
approximately one-half of building occupants, complete with all
utilities and services, but excluding furnishings. Total construction
contract time, including planning and design, is estimated to be
thirty-six (36) months. Fast tracking of the new construction is
anticipated. Because not more than one-half of the building occupants
can be relocated at any one time, there will be at least two major
phases of the renovations. Offeror's proposed schedule is a significant
evaluation factor. Estimated cost range of project is $10 Million to
$25 Million. PRE-PROPOSAL CONFERENCE: 6 July 2000 at Robins AFB, GA.
This solicitation will be available on the Internet. Interested parties
may view and/or download the Request for Proposals from the website.
The website address is http://ebs.sas.usace.army.mil/. Amendments will
only be posted at the Internet site. PROPOSAL EVALUATION FACTORS:
Evaluation factors, subfactors and subparts are listed in the order of
their relative importance, which is in equal or descending order of
importance. Evaluation Factors Are: FACTOR 1. PAST PERFORMANCE:
Subfactor 1. Construction: A. Recent Similar Projects, B. Recent Past
Projects Cost and Time Growth, C. Previous Customer's Satisfaction
(references/awards/recognitions); Subfactor 2. Designers: A. Recent
Similar Projects, B. Recent Past Projects Cost and Time Growth, C.
Previous Customer's Satisfaction (references/awards/recognitions);
FACTOR 2. TECHNICAL SOLUTIONS AND APPROACH: Subfactor 1. Proposed
Technical Solutions (detaileddesign): A. Space/Use Planning, B.
Architectural and Life Safety, C. Mechanical, Plumbing and Energy
Efficiency, D. Electrical and communications, E. Fire Protection, F.
Structural, G. Civil, Sitework and Landscaping; Subfactor 2. Technical
Approach (narrative, not detailed design): A. Partnering, Phasing,
Sequencing, Fast Tracking and Proposed Schedule, B. Space/Use Planning
and Design Services, C. Quality and Cost Consciousness and Assurance,
D. Hazardous Materials Mitigation, Demolition and Occupant's Safety;
FACTOR 3. PLANNING, DESIGN AND CONSTRUCTION MANAGEMENT: Subfactor 1.
Organizational: A. Resources Capacities (financial, equipment and
personnel, B. Organization, Structure, Responsibilities and
Authorities, C. Qualifications of Key Personnel, D. Subcontracting
Plan(s); Subfactor 2. Managerial: A. Planning and Design Coordination
and Reviews Process, B. Respective Roles During Design and
Construction, C. Quality and Cost Assurance Plans (design and
construction), D. Safety Plan(s); FACTOR 4. SPECIALIZED EXPERIENCE:
Subfactor 1. Nature of Work Credentials: A. Design-Build Expertise and
Experience, B. Military Facilities Project Experience (especially Air
Force and/or Army), C. Prior Teaming With Proposed Firm(s); Subfactor
2. Other Credentials: A. Space/Use Planning (especially during
construction), B. Partnering, Phasing, Sequencing and Fast Tracking
Experience, C. Sustainability Experience (design and construction);
PRICE PROPOSAL: (separately bound -- this will not be technically
evaluated) Price and Performance Requirements: A. Standard Form 1442,
B. Lump Sum Price/Cost Proposal, C. Representations and Certifications.
THIS SOLICITATION IS ISSUED ON AN UNRESTRICTED BASIS PURSUANT TO THE
"BUSINESS OPPORTUNITY DEVELOPMENT REFORM ACT OF 1988" (PUBLIC LAW
100-656). PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. THIS
SOLICITATION WILL BE ISSUED IN ELECTRONIC FORMAT ONLY AND WILL ALSO BE
AVAILABLE ON OR ABOUT JUNE 28, 2000 on the internet at
http://ebs.sas.usace.army.mil/ . Amendments to this solicitation will
be posted on the internet at the posted on the Internet, SF30,
amendment of solicitation/modification of contract, and a list of
revised specifications and drawings will be mailed to each bidder.
NOTE: ALL REQUESTS FOR SOLICITATION PACKAGES MUST BE MADE IN WRITING NO
LATER THAN 06/21/00. REQUESTS MAY BE FAXED TO 912-652-5828. DOCUMENTS
WILL BE ISSUED ON A FIRST COME FIRST SERVED BASIS UNTIL SUPPLY IS
EXHAUSTED. IT HAS BEEN DETERMINED THAT THE NUMBER OF SETS BE LIMITED TO
ONE (1) PER FIRM. (ADDITIONAL COPIES WILL BE THE RESPONSIBILITY OF THE
REQUESTOR). STATE NAME OF COMPANY, PHYSICAL ADDRESS AND NINE DIGIT ZIP
CODE, AREA CODE, TELEPHONE NUMBER, FAX NUMBER, BUSINESS SIZE, BUSINESS
TYPE (PRIME, SUBCONTRACTOR, SUPPLIER, PLANS ROOM, ETC.) AND E-MAIL
ADDRESS. PLANS AND SPECIFICATIONS ARE AVAILABLE MONDAY THROUGH FRIDAY,
8:00 A.M.. TO 5 P.M., 100 WEST OGLETHORPE AVENUE, SAVANNAH, GEORGIA
31402-0889. Posted 06/15/00 (W-SN465002). (0167) Loren Data Corp. http://www.ld.com (SYN# 0132 20000619\Y-0016.SOL)
Y - Construction of Structures and Facilities Index Page
|
|