|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 21,2000 PSA#2626U. S. Army Corps of Engineers, 2000 Ft. Point Rd, Contracting Division,
P.O. Box 1229, Galveston TX 77553-1229 Z -- DREDGING GULF INTRACOASTAL WATERWAY, GALVESTON CAUSEWAY TO
BASTROP BAYOU IN GALVESTON AND BRAZORIA COUNTIES, TEXAS. SOL
DACW64-00-B-0026 DUE 072700 POC Lucille Smith, Contract Specialist
(409) 766-3845 or Shakar Misir, Civil Engineer (409) 766-3094 WEB:
Galveston District's Website, www.swg.usace.army.mil/ct. E-MAIL: For
additional information or to request a CD,
lucille.r.smith@usace.army.mil. The plans and specifications will
provide for the removal of approximately 1,312,000 cubic yards of
dredging material comprised of maintenance material from 115,000 feet
of project channel with widths of 125 to required depths of 14 and 16
feet (below mean low tide) and 2 feet of allowable overdepth. Disposal
is in confined, partially confined and open water placement. The work
also includes filling 7,025 feet of 15/20 foot circumference geo-tube
in the construction of marsh restoration project. The plans and
specifications will be available on compact disc only. To request a CD
you must register at USAED-Galveston District's website:
www.swg.usace.army.mil/ct or via e-mail to
lucille.r.smith@usace.army.mil. Subcontracting Goals for the Galveston
District are: 61.4% -- Small Business; 9.1% -- Disadvantaged Business;
5.0% -- Woman-Owned; 1.5% -- Hubzone Small Business. The cost range for
this project is $1,000,000 to $5,000,000. Posted 06/19/00 (W-SN466100).
(0171) Loren Data Corp. http://www.ld.com (SYN# 0117 20000621\Z-0001.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|