COMMERCE BUSINESS DAILY ISSUE OF JUNE 27,2000 PSA#2630U.S. Property & Fiscal Office For Kansas, 2737 S Kansas Ave, Attn:
Contracting, Topeka, KS 66611-1170 Y -- CONSTRUCT LIVE MUNITITONS RAMP, MCCONNELL AFB, KS SOL DAHA14 00
5300 DUE 081500 POC Captain James Culp (316) 687-7807 for Engineering
Questions, Mr. Tom Coleman (785) 274-1211 for Contract Question E-MAIL:
Click here to contact the contracting officer via,
tom.coleman@ks.ngb.army.mil. Construct B1B Live Munitions Ramp for the
Kansas Air National Guard at McConnell AFB, Wichita, Kansas. Project
constructs approximately 79,425 SY B-1B aircraft-parking apron (18-in.
thick concrete, 4-in. cement treated drainage layer, and 8-in. lime
treated subgrade (LTS)) adjacent to existing taxiway. Project
constructs 50-ft wide, primarily asphalt over LTS, shoulders adjacent
to new concrete parking apron. Project grading requires large amounts
of earthwork (cut/fill). Project constructs reinforced concrete box
(RCB) culvert to extend existing storm drainage pipes under new
concrete apron. Project constructs concrete drainage flume, five new
storm inlets, and 10,000-gal spill capacity oil/water separator.
Project constructs 8-in. fire protection main with fire hydrants and
semi-flush taxiway lights at perimeter of apron with two lighted
taxiway signs. Project provides ramp area lighting. Project provides
five 7-ft W x 21-ft H x 76-ft L metal barricades with compacted
granular fill with individual lighting and communications support.
Airfield obstruction lighting to be mounted on top of new area lighting
and barricades. Project provides miscellaneous other pavements
including 12-in. concrete road and 5/7-in. asphalt pavements on LTS.
Apron and support pavements will be stripped. Project demolishes
existing asphalt pavement, and existing security fence and
communications cable to be demolished and replaced. Project relocates
pad-mounted transformer. Project caps and replaces two monitoring
wells. Project dismantles and relocates 2,700 SF metal building to new
site with pavement and electrical support. Project demolishes existing
overhead electrical power system to include poles length of ramp and
constructs new 12470-volt underground primary service. Two primary pad
switches will be required to feed pad-mounted transformers. Project
provides remote camera, site surveillance capability. Project
constructs new 1,300 SF metal building. New facility is climate
controlled with telephone/LAN service (copper andfiber), CCTV, and P.A.
system. Project installs domestic water service, two-1,500 gal concrete
wastewater holding tanks, and required electrical support for new
facility. Bidders must submit with their bid data verifying
accessibility to operational, heavy-duty, fully energized, self
propelled paver-finisher designed specifically for placing,
consolidating, and finishing high quality pavement within guidelines of
project specifications. Pre-approval of machine is required prior to
award. Bidders shall submit with their bid data verifying minimum 10
years work experience with major concrete paving operations using
paver-finisher machine. Pre-approval of work experience is required
prior to award. It is anticipated that the solicitation will be issued
on or about 12 July 2000. Pre-bid conference will be conducted at
10:30 AM on 26 July 2000 in Building 3, Base Civil Engineer Office,
McConnell AFB, Kansas. Estimated cost of this project is between $5 and
$10 million. All responsible bidders may obtain a bid setby submitting
a cashier's check or money order payable to the U.S. Treasury in the
amount of $258.00. This fee is non-refundable. Plans and specifications
will be sent to you automatically upon there release and approval.
Request for bid sets should be mailed to USPFO/KS, ATTN: Contracting
Officer, 2737 S. Kansas Ave., Topeka, KS 66611-1170. All responsible
sources may submit a bid, which will be considered. Posted 06/23/00
(W-SN467846). (0175) Loren Data Corp. http://www.ld.com (SYN# 0123 20000627\Y-0005.SOL)