COMMERCE BUSINESS DAILY ISSUE OF JUNE 28,2000 PSA#2631Eldorado National Forest, 100 Forni Road, Placerville, CA 95667 Y -- MEISS ERFO CONSTRUCTION SOL RFP-IBET-03-00-017 DUE 082200 POC
Kathryn M. Griffin, Contracting Officer, 530-621-5295 or Dave Jone,
COR, 530-621-5248 WEB: RFP-IBET-03-00-017 Meiss ERFO Construction,
http://www.clarint.com/tnf/. E-MAIL: 6300 RFP-IBET-03-00-017 Meiss ERFO
Construction, mailroom_r5_eldorado@fs.fed.us. Project consists of
improving 3 (three) stream crossings and road surfacing on 5 (five)
other sites on Forest Road 9N30 on the Eldorado National Forest,
Placerville Ranger District. Items of work at 3 sites include, but not
limited to: clearing & grubbing of debris in stream channel; reshape
stream bed gravel; removal of culvert; removal of welded wire retaining
structures; reconstructing approaches to stream crossing;
machine-placed riprap; placing & compacting crushed aggregate base
course; placing & compacting asphalt concrete surface course; seeding
& mulching disturbed areas; and constructing low water crossings. The
low water crossings include: minor structure excavation; reinforced
structural concrete; fabrication & installation of structural steel
cattle guard grates; and machine-placed riprap protection. Items of
work at the other 5 sites include placing & compacting crushed
aggregate base course; and placing & compacting asphalt concrete
surface course. Estimated price range is between $250,000 and $500,000.
Project is estimated to take 80 days to complete. There will be NO
pre-proposal meeting or tour. To reach site from Placerville, travel
East on State Highway 50 approximately 15 miles to the community of
Pollock Pines, Sly Park road turnoff. Travel south on Sly Park road
(E-16) approximately 5 miles to the junction of the "Mormon Emigrant
Trail". Travel east on "Mormon Emigrant Trail" (10N50 & 5),
approximately 11 miles to the junction of the "North-South Road" (10N83
& 6). Travel south on the North-South Road approximately 7.3 miles to
the junction of Forest Road 9N30. Travel east on 9N30 approximately 0.4
miles to the first of 8 (eight) total project sites. To request
solicitation package, please place request via web site, email, or via
fax (530) 621-5258. Posted 06/26/00 (W-SN468515). (0178) Loren Data Corp. http://www.ld.com (SYN# 0127 20000628\Y-0020.SOL)