|
COMMERCE BUSINESS DAILY ISSUE OF JULY 3,2000 PSA#2634USDA -- Wenatchee National Forest, Procurement and Property Management,
215 Melody Lane, Wenatchee, WA 98801 Y -- CONSTRUCTION CATHEDRAL TRAIL BRIDGE, CLE ELUM RANGER DISTRICT,
KITTITAS COUNTY, WASHINGTON SOL RFQ R6-17-00-33 DUE 081000 POC Rosie
McDonald, 509/664-2715 E-MAIL: click here to request solicitation
package via e-mail, ekinamon@fs.fed.us. This project is being
advertised as a written quotation and is being solicited under the
Simplified Acquisition Procurement (SAP) rules. The project consists of
construction of one 60 foot steel truss trailbridge. Items of work
include: Removal and disposition of the existing log stringer bridge
and removal and disposal of the existing steel frame bridge.
Fabrication, transportation and installation of a steel truss bridge
with handrails, concrete abutment caps and approaches. Government
Estimate is between $25,000.00 and $100,000.00. No bid or performance
bond will be required. An Alternate Payment Protection (payment bond)
will be required upon award. Estimated start work date is 9/1/00 with
a completion date of 9/1/01. SIC code is 1629. Documents will be
available approximately 7/10/00. Posted 06/28/00 (W-SN469640). (0180) Loren Data Corp. http://www.ld.com (SYN# 0223 20000703\Y-0028.SOL)
Y - Construction of Structures and Facilities Index Page
|
|