Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF JULY 11,2000 PSA#2639

C1 (14) F210 OIC of Navfac Contracts, NETC, Bldg 1, Simonpietri Drive, Newport, RI 02841-1712

Z -- ELECTRICAL REPAIRS/UPGRADES TO LOAD CENTERS AT PIER II, NAVAL STATION, NEWPORT, RI SOL N62472-00-B-6943 DUE 082400 POC Karen Sampson (401) 841-2544 ext. 103 E-MAIL: Click here to contact the contract specialist, sampsonkl@efdnorth.navfac.navy.mil. The work includes all labor, materials, equipment, supervision and management for all removals and installations required for the upgrade/replacement of 15 KV sectionalizing switches, 480V switchgear and all related and incidental work associated with the interior of Load Center 3 including the work required to reconnect the existing 480 volt and control circuits that extend from Load Center 3 to North Pier Electrical Hoods No.10 and 13 if Bid option 1 is not exercised as well as the work to reconnect existing 2000KVA distribution transformers if Option 6 is not exercised. The work is located on Pier 2 at Naval Station Newport, RI. The completion time for the basic requirement is 180 calendar days. There will be a provision for six bid options for similar work. Bid Option 1: Bid Option 1 includes removal of existing 480 volt control circuits and all associated supports from Load Center 3 to North Pier Electrical Hoods No. 10 and 13 and installation of new 480 volt and control circuits from Load Center 3 to North Pier Electrical Hoods No. 10 and 13. Bid Option 1 also includes removal and replacement of North Pier Electrical Hoods No. 10 and 13 related incidental work. This option can be exercised at the time of award or within 120 days after award. If this option is exercised, the contract completion time will be extended by 90 calendar days. Bid Option 2: Bid Option 2 includes all removals and installations required for the upgrade/replacement of 15KV sectionalizing switches, 15KV-480V distribution transformers, 480V switchgear and all related and incidental work associated with the interior of Load Center 3A including the work required to reconnect the existing 480 volt and control circuits from Load Center 3A to South Pier Electrical hoods No. 10 and 13 if Bid Option 3 is not exercised. This option can be exercised at the time of award or within 120 days after award. If Option 2 is exercised, the contract completion time will be extended by 120 calendar days. Bid Option 3: Bid Option 3 includes removal of existing 480 volt circuits, control circuits, and all associated supports from Load Center 3A to South Pier Electrical Hoods No. 10 and 13 and installation of new 480 volt and control circuits from Load Center 3A to South Pier Electrical Hoods No. 10 and 13. Bid Option 3 also includes removal and replacement of South Pier Electrical Hoods No. 10 and 13 and related and incidental work. This option can be exercised at the time of award or within 120 days after award. If Option 3 is exercised the contract completion time will be extended by 90 calendar days. Bid Option 4: Bid Option 4 includes all removals and installations required for the upgrade /replacement of 15KV sectionalizing switches, 15KV-480KV distribution transformers, 480V switchgear and all related and incidental work associated with interior of Load Center 1 including the work required to reconnect the existing 480 volt and control circuits from Load Center 1 to North Pier Electrical Hood No. 1 and South Pier Electrical Hood No. 1 if bid option 5 is not exercised. This option can be exercised at the time of award or within 120 days after award. If Option 5 is exercised the contract completion time will be extended by 120 calendar days. Bid Option 5: Bid Option 5 includes removal of existing 480 volt circuits, control circuits and all associated supports from Load Center 1 to North Pier Electrical Hoods No. 1 and South Pier Electrical Hoods No. 1 and installation of new 480 volt and control circuits from Load Center 1 to North Pier Electrical Hoods No.1 and South Pier Electrical Hoods No. 1. Bid Option 5 also includes removal and replacement of North Pier Electrical Hoods No. 10 and 13 and related and incidental work. This option can be exercised at the time of award or within 120 days after award. If Option 5 is exercised the contract completion time will be extended by 90 calendar days. Bid Option 6: Bid Option 6 includes all removals and installations required for the replacement two 2000KVA, 15KV-480V distribution transformers and all related andincidental work associated with connecting the transformers to the switchgear within Load center 3. This option can be exercised at the time of award or within 120 days after award. If Option 6 is exercised the contract completion time will be extended by 60 calendar days . Except when it is determined in accordance with FAR 17.206b not to be in the government's best interest, the government will evaluate offers for award purposes by adding the total price for the basic requirement and options 1 through 6. Evaluation of options will not obligate the government to exercise the option(s). This solicitation is issued as UNRESTRICTED. The standard industrial classification code (SIC) is 1731 and the size standard $7.0 million. A small, small disadvantaged and women-owned small business subcontracting plan pursuant to the FAR clause 52.219-9 (AUG 1996) will be required to be submitted by all large businesses being considered for contract award. The estimated cost range is between $1 million and $5 million. Davis Bacon Wages are applicable to this project. The ESTIMATED bid opening date is 24 AUG 2000. To obtain Plans and Specifications for this project there is a NON-REFUNDABLE FEE OF $25.00 . Solicitations MAY be available on 24 JULY 2000 from the Defense Automated Printing Service (DAPS), 47 Chandler St., Newport, RI, phone (401) 841-3183. Written requests MUST be accompanied by an acceptable form of payment, VISA, MASTER CARD, DISCOVER CARD, CERTIFIED, CASHIERS OR COMPANY CHECK made payable to the "SUPERINTENDENT OF DOCUMENTS", and annotated with the solicitation number. Requests received by DAPS without the solicitation number annotated on the request and the check or the check is not made payable to the Superintendent of Documents will NOT be processed. If you would like information on obtaining a planholders list or the mailing of the solicitation package via expedited courier service, please contact the Defense Automated Printing Service at (401) 841-3183. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE IN THE CONTRACTS OFFICE. Per the Debt Collection Improvement Act of 1996, the Defense Federal Acquisition Regulation Supplement (DFARS) has been amended to require all contractors to register in the Department of Defense (DOD) Central Contractor Registration (CCR) Database. Be advised for solicitations issued after May 31, 1998, failure to register in the CCR makes an offeror ineligible for award of DOD contracts. Information regarding this registration may be obtained by accessing the website at www.ccr2000.com or by referring to DFARS Subpart 204.73. Offerors should submit verification of their firm's registration in the CCR Database with their proposal. Questions concerning the subject notice are to be directed to Ms. Karen Sampson, Contract Specialist at (401) 841-2543 ext. 103. For Technical questions please fax to (401) 841-1349. Posted 07/07/00 (W-SN472467). (0189)

Loren Data Corp. http://www.ld.com (SYN# 0150 20000711\Z-0011.SOL)

Z - Maintenance, Repair or Alteration of Real Property Index  |  Issue Index |


Created on July 10, 2000 by Loren Data Corp. -- info@ld.com