COMMERCE BUSINESS DAILY ISSUE OF JULY 14,2000 PSA#2642 USDA-Natural Resources Conservation Service, Attn: Contracting Officer,
100 East B Street, Room 3124, Casper, WY 82601-1969 Y -- EARTHEN CONSTRUCTION OF THE WEST GREELEY PHASE OF ALLISON DRAW
FLOOD CONTROL CHANNEL PROJECT SOL NRCS-2-WY-00 DUE 091200 POC Sue
Jones, Contracting Officer, 307-261-6468 E-MAIL:
sue.jones@wy.nrcs.usda.gov, sue.jones@wy.nrcs.usda.gov. Allison Draw
Watershed -- West Greeley Phase -- Earthen Construction. Construction
will consist of mobilization; approx. 22 acres of seeding and mulching;
dewatering; 93,880 cuyd common excavation; 5,800 cuyd channel topsoil;
12.2 acres of topsoil for spoil area; 3,940 cuyd rock riprap; 1,520
cuyd gravel bedding; 6,000 lf fencing; 10,500 sqyd geotextile; 700 lf
silt fence; traffic control; and piling. Project is located along the
Allison Draw water course on the south side of Cheyenne, Wyoming.
Performance time is 109 calendar days. Estimated price range $500,000
to $1,000,000. Contractors submitting a bid for this project are
strongly urged to attend the site showing planned for August 29, 2000.
Bid opening is set for September 12, 2000 Construction Notice to
Proceed will not be issued until spring of 2001. All responsible
sources may submit a bid which will be considered by the agency. IFB
will be available o/a July 31, 2000. IFB can be obtained by mailing to
the address in 7 above, by faxing 307-261-6490, or by calling
307-261-6468. When requesting be prepared to provide company name,
address, phone number and fax number. ***** Posted 07/12/00
(W-SN474108). (0194) Loren Data Corp. http://www.ld.com (SYN# 0159 20000714\Y-0037.SOL)
| Y - Construction of Structures and Facilities Index
|
Issue Index |
Created on July 12, 2000 by Loren Data Corp. --
info@ld.com
|
|
|