COMMERCE BUSINESS DAILY ISSUE OF JULY 19,2000 PSA#2645 Veteran's Affairs Medical Center, Contracting Officer (90C),
Acquisition & Material Management Service, One Veterans Plaza, San
Juan, PR 00927-5800 C -- RENOVATE WARDS 2B2 & 2C2, PROJECT NO. 672-702 SOL 672-260-00 DUE
081700 POC Myrna Bermudez 787-641-8379 E-MAIL: click here to contact
the contracting officer via, myrna.bermudez@med.va.gov. The Department
of Veterans Affairs, VA Medical Center (VAMC), San Juan, Puerto Rico
is soliciting for the services of an Architect Engineer (A/E) firm to
include but not limited to preparation of design, plans,
specifications, estimates, record drawings, reports, surveys and
construction inspections in the design and renovation of hospital
projects. The A/E is to verify as-built drawings and develop
construction documents (drawings and specifications), construction cost
estimates and proposed construction schedule based on the block area
drawings and/or design program provided by the VAMC and provide
necessary construction period services for the project titled "RENOVATE
WARDS 2B2 & 2C2" PROJECT N0.: 672-702 to renovate wards 2B2 & 2C2 in
the second floor of building #1. The project will include the re-design
of two typical second floor Psychiatric Wards. It will convert one of
them (2C2) from a 30-bed Psychiatric Ward to a 24-bed Medical Ward. The
other ward (2B2) will be renovated into a Psychiatric Ward and will be
upgraded to current standards. The A/E design work shall include the
design of architectural, civil, electrical, plumbing, mechanical and
interior design work. Mechanical design shall include a new air
conditioning system following the A/C Master plan to be provided by VA.
Design work shall be made in accordance to the current VA design
guides, standards and requirements, ADA, NFPA, ASHRAE, local and
federal codes. The A/E shall develop the Conceptual, Schematic
Drawings, Design Development, and the construction documents (drawings
and specifications) as per requirements of the VA Handbook H-08-15,
Volume C. The A/E selection criteria shall include the following
elements (a) through (m), in addition to the selection criteria in NOTE
24 of the CBD (not necessarily listed in order of importance or merit):
(a) Professional qualifications of the team proposed for this project
necessary for satisfactory performance of required services; (b)
Specialized experience and technical competence in the type of work
required; (c) Specific previous experience and qualifications of
personnel proposed for this project, including project description; (d)
Proposed management plan and team organization during the design and
construction phases; (e) Proposed design approach for this project.
Describe design philosophy, any problems anticipated to accomplish
work, how to solve them and innovative approaches in production and
design; (f) Cost control to include what techniques to be utilized, and
who is responsible. Discuss recent projects to demonstrate ability to
meet project cost target; (g) Estimating effectiveness. Review the five
most recently bid projects to demonstrate estimating effectiveness; (h)
Schedule control to include techniques utilized to assure schedules
will be met, who is responsible for them and discuss recent projects to
demonstrate ability to meet project schedules; (i) Geographic locations
and facilities of working office of prime and all
consultants/subcontractors; (j) Capacity to accomplish work in the
required time; (k) Past performance on Government and private industry
contracts to show cost control, quality of work and compliance with
performance schedules; (1) Describe experience and capabilities in the
following areas: Value Engineering, Life Cycle Cost Analysis (LCCA),
Critical Path Method, Fast-Track Construction, Energy Conservation, New
Energy Resources, Environmental Assessment, Specialized Experience,
Computer Aided Design and Drafting (CADD), and other computer
applications; (m) Describe awards received for excellence. Describe
litigation the firm has been involved in within the last five years.
Indicate type and amount of liability insurance. Estimated construction
cost is between $2,000,000.00 and 3,000,000.00. The successful A/E firm
must establish a field office within commuting distance of the DVA
Medical Center, 10 Casia Street, San Juan, Puerto Rico due to the
amount of site work necessary to develop the as built drawings and the
required construction phasing coordination among VA-services, selected
A/E, SEISMIC project and contractors. This is not a request for
proposal. Architect-Engineer firms which meet the requirements
described in this announcement are invited to submit: (1) a Standard
Form 254, Architect-Engineer and Related Services Questionnaire, (2) a
Standard Form 255, Architect Engineer and Related Services
Questionnaire for Specific Project to the issuing office of this
procurement. Firms responding to this announcement on or before the
closing date will be considered for selection, subject to any
limitations indicated with respect to geographic location of firm,
specialized technical expertise or other requirements listed. All
requests for information should be in writing and faxed to the
Contracting Office, to the attention of Ms. Myrna Bermudez, at (787)
641-8364. This procurement is subject to the availability of funds. See
NOTE #24. Posted 07/17/00 (W-SN475598). (0199) Loren Data Corp. http://www.ld.com (SYN# 0027 20000719\C-0010.SOL)
| C - Architect and Engineering Services - Construction Index
|
Issue Index |
Created on July 17, 2000 by Loren Data Corp. --
info@ld.com
|
|
|