COMMERCE BUSINESS DAILY ISSUE OF JULY 21,2000 PSA#2647 Federal Emergency Management Agency, Mt. Weather Emergency Assistance
Center, 19844 Blue Ridge Mountain Road, Bluemont, VA 20135 23 -- TANKER TRAILERS SOL EMV-2000-RP-0035 DUE 080100 POC Jennie K.
Nickleson, Contract Specialist, 540/542-2133 E-MAIL: RFP --
EMV-2000-RP-0035, jennie.nickleson@fema.gov. EMV-2000-RP-0035
(Submission No. 454204) previously posted in the CBDnet on May 12, 2000
has been amended. Amendment No. A003 is issued to the combined
synopsis/solicitation for Tanker Trailers. This amendment is issued in
accordance with FAR Subpart 12.6 as supplemented with additional
information included in this notice. This announcement constitutes the
third amendment to the above solicitation, offers are being requested,
and a written amendment will not be issued. This amendment is issued to
provide answers to questions received regarding the
synopsis/solicitation. QUESTIONS/ANSWERS: (1) Question: What is FEMA's
water plant plumbing specifications and connections for the current
water purification units? Answer: FEMA's water plant has a potable
water discharge hose that measures 1.25" in diameter with a female
1.25" cam-lock connection at the end of the supply hose. The water
tanker should allow for this connection from the water purifying plant
to the tanker fill. (2) Question: What is the tank fill connection
size? Answer: The size is a 3" male-cam-lock connection on fill and
discharge connector. (3) Question: Is this unit to be sized to handle
all components operating at the same time or size to handle largest
load demand for single operations? Answer: To handle largest load
demand for single operation. (4) Question: Do you have an existing unit
in operation you are now using satisfactorily? Or any sections on this
unit? Answer: No. (5) Question: Where is this diesel driven generator
to be located? Answer: The fully operational diesel generator is to be
located in a separate compartment forward of the axles below water
tanker. (5a) Question: What are the specifications for the diesel
generator? Answer: The water tanker manufacturer will provide one
diesel engine generator in an environmental weatherproof enclosure
which will provide ventilation and continuous electrical power. The
size will be to power the product dispensing pump, plus any electrical
heating requirements for the water tanker, and three additional
external lights mounted on the trailer (one per side and one rear). A
diesel engine with minimum of 24 hours continuous operation is required
for an independent fuel tank with easy access for refueling. Electrical
power will be through a minimum of eight receptacles in separate
weatherproof boxes for easy access. Two of these receptacles will be of
the ground fault interruption (GFI) type. The internal electrical lines
for the heating elements will be hardwired via a power distribution
box. Two appropriately size circuit breakers will be provided; one
circuit breaker sized to meet power dispensing pump, and the second CB
for electrical receptacle. Two (2 ea) eight foot electrical grounding
stakes, one hammer/maul, and a 12 foot copper grounding ribbon with
adequate internal storage will be provided. (6) Question: What is meant
by "weight 11200 lbs. + or 3%?Answer: To be of the legal weight limits
for highway use in all states. (7) Question: Specifications state four
baffles are required, can two be used? Answer: After consideration of
all of the tanker manufacturer's products, two baffles are acceptable.
(8) Question: The clean-in place system specification is unclear, can
you describe your requirements? Answer: The clean-in place system
shall be furnished and installed in a way that all compartments have
full coverage to clean interior of tank. (9) Question: It appears that
only one manufacturer can provide the covered bolsters, will you
accept a full wrap design? Answer: The covered bolsters were included
in the specifications, however, it is not required. The full wrap
design is acceptable. (10) Question: Please clarify bulb type of
thermometer? Answer: Any type of thermometer which can identify water
temperatures within the tank is acceptable. (11) Question: Your
specifications ask for Ingersoll axles, will an equal be acceptable?
Answer: Any type of axles that meet the axle specifications will be
acceptable. (12) Question: The specifications call for ABS Midland FF
(S/S/1M) anti-skid brake system is a equal acceptable? Answer: Yes (13)
Question: How is all of the plumbing, clean in place and pumping
systems going to function? Answer: It is up to the manufacturer's
design and specifications of each unit to have all elements working
together. (14) Question: What type of electric heater is required?
Answer: The heating system shall provide adequate heating to prevent
water cargo area from freezing. (15) Question: Does Heil need to match
the spec as written or can we offer/provide substitutions? Answer: An
equal is acceptable. (16) Question: Will you accept a 10 gauge heads?
Answer: Yes. (17) Will you accept a fiberglass insulation? Answer:
Yes. (18) Will you accept 22 gauge sides and 18 gauge heads? Yes,
provided a fully loaded trailer with accessories meets FHWA weight
limit regulations. (19) Will you accept a Type 316 stainless steel in
lieu of Type 304? Answer: No. (20) Potable water does not need to meet
food grade specifications, will you accept a tanker that meets
drinking water requirements? Answer: No. (21) Can we use 32 gauge
aluminum jacketing in lieu of 24 gauge stainless steel? Answer: No.
Bidders must acknowledgement receipt of this amendment before the hour
and date specified in the RFP. Failure of this acknowledgement may
result in rejection of your proposal. If as a result of this amendment
you desire to change a proposal already submitted, such a change may
be made by a letter. The letter must refer to the RFP No.
EMV-2000-RP-0035 and this amendment, and be received before the opening
hour and date specified. The synopsis/solicitation EMV-2000-RP-0035 is
amended as indicated above. As a result of the changes made herein,
the hour and date for receipt of proposals is hereby extended from 4:00
p.m., EDST, June 09, 2000 to 4:00 p.m. EDST, August 01, 2000. Except as
provided herein, all other terms and conditions of EMV-2000-RP-0035
remain unchanged and in full force and effect. End of Amendment No.
A003 to synopsis/solicitation number EMV-2000-RP-0035. Posted 07/19/00
(W-SN476690). (0201) Loren Data Corp. http://www.ld.com (SYN# 0215 20000721\23-0002.SOL)