COMMERCE BUSINESS DAILY ISSUE OF JULY 24,2000 PSA#2648 Department of the Air Force, Air Force Materiel Command, AFFTC -- AF
Flight Test Center, 30 North Wolfe Avenue, Edwards AFB, CA, 93524-6351 49 -- F-22 HYDRAULIC SUPPORT SYSTEMS SOL Reference-Number-HY-00 DUE
080700 POC Senah Williams, Contract Negotiator, Phone DSN527-7708, Fax
661-275-7806, Email senah.williams@edwards.af.mil -- John Adair,
Contracting Officer, Phone 661-277-8436, Email
john.adair@edwards.af.mil WEB: Visit this URL for the latest
information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=Reference-Number-HY-00&LocID=906. E-MAIL: Senah Williams,
senah.williams@edwards.af.mil. The Air Force Flight Test Center,
Edwards AFB, CA (AFFTC) intends to award a contract to Hydraulics
International, Inc., Chatsworth CA. The requirement is for four (4)
Hydraulic Support Systems (HSS), capable of producing fluid mass
deliveries, pressures, and temperatures for the Air Force F-22
aircraft. The HSS shall be a computerized hydraulic pumping unit
designed to check the performance and operating characteristics of
aircraft hydraulic systems. It shall be semi-portable, mounted on skid,
and forklift accessible from both sides. The HSS shall accomplish the
following operations: 1)Provide a source of filtered, deaerated and
dehumidified hydraulic fluid at controlled pressures and flow rates up
to 500 feet in distance from the HSS, meeting the operating parameters
described in the statement of work to operate the aircraft hydraulic
components without the necessity of starting the aircraft engine. 2)
Test the aircraft hydraulic system for evidence of component
malfunction or failure and leakage of hydraulic fluid. 3) Drain or
refill aircraft_s hydraulic system and/or reservoir. 4) Provide sources
of hydraulic power for static proof pressure testing of aircraft
systems and components at pressure up to 5000 PSIG. 5) Fill the
aircraft reservoir through adjustment of backpressure. 6) Fill or drain
aircraft reservoirs through fill and vent system. 7) Improve physical
characteristics of the hydraulic fluid by controlling its temperatures
and reducing particulate, air and water content. 8) Perform the above
functions remotely from a computer-based control/monitor system and
locally from a control panel mounted on the HSS. Training on use of the
systems will be required. Delivery of initial system for testing is
required 18 weeks after contract award with the remaining three units
due 27 weeks after contract award. Interested companies are required to
provide relevant past/present performance information and current
product specifications to Janice White at the above address or fax to
(661) 277-2114 no later than 07 August 2000. See Notes 22 and 26.
Posted 07/20/00 (D-SN477032). (0202) Loren Data Corp. http://www.ld.com (SYN# 0288 20000724\49-0001.SOL)