COMMERCE BUSINESS DAILY ISSUE OF AUGUST 4,2000 PSA#2657 U.S. Army Corps Of Engineers -- Mobile, Contracting Division, CESAM-CT
(109 St. Joseph Street 36602) PO Box 2288, Mobile, AL 36628-0001 Y -- DREDGING BAYOU CASSOTTE EXTENSION PROJECT, PASCAGOULA HARBOR, MS
SOL DACW01-00-B-0031 DUE 091900 POC Contact Karen Johnson,
(334)690-2535; Contracting Office, Sue L. Speights WEB:
http://www/sam/usace.army.mil/sam/ct,
http://www/sam/usace.army.mil/sam/ct. E-MAIL:
cesam.plansroom@sam.usace.army.mil, cesam.plansroom@sam.usace.army.mil.
The project consists of widening Bayou Cassotte Inner Harbor from 300
ft. to 350 ft. and deepen it to 42 ft. The project limits are from the
turning basin at the mouth of the Bayou approximately 5,000 ft. to the
north. Estimated quantity is 800,000 c.y. to be disposed of in the open
waters of the Gulf. Unrestricted. The Standard Industrial
Classification (SIC) code for this project is 1629. Note No.1: Bidders,
subcontractors and Dodge Plan Rooms are required to self-register their
firm or office on the Internet to receive one CD-ROM. Registration
instructions are available on the Internet at
http://www.sam.usace.army.mil/. Neither telephonic, mailed, nor fax
requests will be accepted. Those registering are responsible for the
accuracy of the information on the mailing list. Registration must
include the firms physical address, telephone, a valid fax number and
a point of contact. Registration should be completed one week prior to
the issue date. All notifications of changes to this solicitation
shall be made through the Internet only. It is therefore the
contractors responsibility to check the Internet address listed above
daily, for any posted changes to this solicitation. Actual solicitation
amendments will be issued either by fax, 3.5" diskette or CD-ROM. The
plans and specifications will be issued on Compact Disc (CD-ROM) only
and will be provided free of charge. Plans and specifications will not
be provided in a printed paper format; however, the Government
reserves the right to revert to paper medium when it is determined to
be in the Government's best interest. Note No. 2. All bid forms, bid
bonds, and other normal documents required for the bid submittal,
including amendments to the bid submittal, shall be in paper medium.
Electronic medium for the bid submittal documents will not be allowed.
Note No. 3. CRITICAL PATH METHOD (NETWORK ANALYSIS SYSTEM) IS NOT
REQUIRED. Note No. 4. FOR THIS JOB, A SMALL BUSINESS IS DEFINED AS
HAVING AVERAGE ANNUAL RECEIPTS OF LESS THAN $13,500,000 FOR THE PAST
THREE YEARS. Note No. 5. EFFECTIVELY IMMEDIATELY: Presolicitation
Notices will no longer be issued by the Mobile District for Projects in
the Continental United States and Puerto Rico. Advertisement of Mobile
District projects will be through the Commerce Business Daily and/or
the Mobile District Contracting Homepage. DETAILED INFORMATION ON THIS
AND OTHER MOBILE DISTRICT PROJECTS (Ordering Solicitations, Points of
Contact, Synopsis of Work, Plan Holders, Bid Results, etc.) ARE
AVAILABLE ON THE INTERNET AT: http://www.sam.usace.army.mil/ SPECIFIC
QUESTIONS RELATED TO THIS PROJECT MAY BE ANSWERED BY MR. ALLEN HARRISON
AT PHONE: 334-694-3624, FAX 334-690-2902. REFER QUESTIONS ON
DISTRIBUTION OF PLANS AND SPECIFICATIONS TO THE MOBILE DISTRICT CORPS
OF ENGINEERS PLANS ROOM AT 334-690-2535/6, FAX 334-694-4343. Posted
08/02/00 (W-SN481506). (0215) Loren Data Corp. http://www.ld.com (SYN# 0252 20000804\Y-0036.SOL)
| Y - Construction of Structures and Facilities Index
|
Issue Index |
Created on August 2, 2000 by Loren Data Corp. --
info@ld.com
|
|
|