COMMERCE BUSINESS DAILY ISSUE OF AUGUST 30,2000 PSA#2675 1940 Allbrook Drive, Suite 3 Wright-Patterson AFB, OH, 45433 Z -- SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER)
SOL F33601-00-R0035 DUE 101000 POC Deloris Smith,937-257-4844 Ext 4130
WEB: 00R0035PKW-Simplified Acquisition of Base Engineering,
http://www.pixs.wpafb.af.mil/pixslibr/00R0035PKW/00R0035PKW.asp.
E-MAIL: Deloris.Smith@wpafb.af.mil, Deloris.Smith@wpafb.af.mil.
Background "Attendance Sheet for the 18 Aug 00 Industry Day has been
posted. UPDATE 18 AUG 00 SLIDES FROM INDUSTRY DAY HAVE BEEN LOADED AND
POSTED! UPDATE AUG 4, 2000 All technical problems have been resolved.
If you have any questions or comments regarding the Statement of Work
(SOW), please notify Deloris Smith at (937) 257-4844 ext 4130 or email
me at Deloris.Smith@wpafb.af.mil Industry Day will be held on Aug 18,
2000 at Building 230, (Conference Center) at 9:00 AM -- 12:00 PM.
Directions to Building 230 Subject: Directions from the Gates From gate
1-C After proceeding through the gate, proceed forward to the stop
light. Proceed through the stop light in about 300 yards, you will come
to a four way stop. Turn left at the stop sign. One block down,
Building 230 (Conference Center) will be on the right hand side. You
can turn right on the first or second driveway. Either one of the
driveways will take you to the parking lot for the conference center.
From Gate 15-A (off I-675) Proceed through light and stop sign. This
will put you on a divided road. (Speed Limit 45mph) Follow this road as
it bends toward the airfield. You will pass a prairie field on the left
and a golf course on the right. The prairie is Huffman Prairie where
the Wright Brothers did their flight testing. After about 1.5miles, you
will come to a parking lot on the left, (reduce speed to 30mph).
Proceed past the long parking lot. The road will bend to the right and
go up a slight incline. At the top of the incline you will come to a
four way stop. Turn right at the stop sign. One block down, Building
230 (Conference Center) will be on the right hand side. You can turn
right on the first or second driveway. Either one of the driveways will
take you to the parking lot for the conference center. REVISED SOURCE
SOUGHT SYNOPSIS SIMPLIFIED ACQUISITION OF BASE ENGINEERING
REQUIREMENTS: This is a revised sources sought synopsis for the above
requirement. All sources capable of providing the following services
are being sought. This includes, but is not limited to, firms currently
participating in the following Small Business Administration (SBA)
programs: HUBZone Small Business Small Disadvantaged Business 8(a)
Woman Owned SIC Code: 1542 The size standard was adjusted from 17M to
27.5M effective 17 Jul 2000. This is NOT a notice of RFP issuance. The
88 Civil Engineer Group anticipates a competitive acquisition to
provide construction support at Wright-Patterson Air Force Base to
support the mission of the Aeronautical System Center, Air Force
Research Laboratories, 88 Air Base Wing, National Air and Intelligence
Center, several other customers and their successors. This is an
indefinite quantity contract for construction efforts. Construction
projects will be awarded by individual delivery orders on an as-needed
basis. The contractor will be required to provide all labor,
materials,(unless furnished by the government), equipment
transportation, supervision, mobile communication, and minimal designs
(35%) to accomplish a broad range of maintenance,repair, and minor
construction work on real property at Wright-Patterson Air Force Base,
Ohio. Facilities include research and development, hospital, secured
areas, airfields, flight line, infrastructure, office, residential,
pavements, industrial, etc. Prompt response and execution of all
delivery orders are required. The performance period for the base year
will be 365 days. Four one-year options may be awarded. The Base
period of performance for the indefinite delivery, indefinite quantity
contract (IDIQ) will be 1 May 01 -- 30 April 02. The period of
performance for individual delivery orders will be based on a site
visit, project proposal submissions, and standard construction
performance periods. Pricing for each delivery order will be based on
the latest issue of the RS Means Database, Unit Price Book (UPB), any
Custom Price Book required (CPB), and Non-Pre-Priced Items (NPP). All
pricing data will be updated annually. The most economical standard of
construction practices will be used at all times. This is a follow-on
effort to the current contract, F33601-96-DW-005. Required contractor
expertise includes a Contract Manager, Environmental Manager, Design
Manager, Quality Assurance Evaluator, and Project Manager. See the
draft statement of work (SOW) below for more details. The Capabilities
Package can be accessed at the PIXS site. " Posted 08/28/00
(D-SN490788). (0241) Loren Data Corp. http://www.ld.com (SYN# 0142 20000830\Z-0010.SOL)
| Z - Maintenance, Repair or Alteration of Real Property Index
|
Issue Index |
Created on August 28, 2000 by Loren Data Corp. --
info@ld.com
|
|
|