COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 18, 2000 PSA #2749
SOLICITATIONS
E -- PRIVATIZATION OF ELECTRIC DISTRIBUTION SYSTEM AT ROCK ISLAND ARSENAL, ROCK ISLAND, IL
- Notice Date
- December 14, 2000
- Contracting Office
- HQ OSC, Attn AMSOS-ACI, Bld 350, 5th Floor Middle Bay, Rock Island IL 61299-6000
- ZIP Code
- 61299-6000
- Response Due
- January 3, 2001
- Point of Contact
- Ms. Jodie Bennett, (309) 782-8541
- E-Mail Address
- Click here to contact the Contract Specialist via (bennettj2@osc.army.mil)
- Description
- SOURCES SOUGHT FOR THE POTENTIAL PRIVATIZATION OF THE ELECTRIC DISTRIBUTION SYSTEM AT ROCK ISLAND ARSENAL, ROCK ISLAND, IL. The Operations Support Command (OSC) seeks to identify responsible potential sources and obtain information in regards to privatization of utility systems in accordance with 10 USC 2688, Utility Systems: Conveyance Authority. OSC is seeking interest and information specifically for the potential privatization of Rock Island Arsenal's Electric distribution system. The potential privatization action will include the transfer of ownership, operation and maintenance, and the obligation to serve. The Army intends to retain ownership of all land and will grant easements and leases for access to land associated with the utility system. OBJECTIVE: Should privatization occur, the ownership of Rock Island Arsenal's Electric Distribution system, operation and maintenance and obligation to continue to provide utility service for an indefinite and ongoing period will transfer to a publicly or privately owned utility service provider. All responsibility for maintaining reliable utility service, including such items as environmental compliance, maintenance costs, major system renovations, construction, equipment, manpower and overhead costs will become the utility service provider's responsibility. It is intended that the privatization will ultimately reduce the Army's life-cycle costs for operating and maintaining the natural gas system. SYSTEM DESCRIPTION: The following is provided only to give an approximation of the size, scope and general description of Rock Island Arsenal's Electric Distribution system. Any numbers may be used for estimating purposes only. The Arsenal owns and operates the electrical utility system consisting of: five (5) 13.8 kV distribution substations, approximately 1 circuit miles of 69 kV overhead transmission line, 13 circuit miles of 13.8 and 2.4 kV overhead primary distribution lines, 18 circuit miles of 13.8 and 2.3 kV underground primary distribution lines, 15 circuit miles of overhead/underground street lighting circuites, hydroelectric plant with eight 430 kVA, 2.4 kV generators. PROCEDURES: This request to interested parties is for gathering information and is a required component and systematic process to evaluate the interested parties under the U.S. Army's utilities privatization program. In order to minimize costs both to potentially interested parties and the government, this notice is being issued to determine the interest and feasibility of proceeding with a formal request for proposals. Should insufficient credible interest be identified for a privatization action, it is highly likely that no formal solicitation will be issued. SHOULD INTEREST BE DETERMINED SUFFICIENT, A FORMAL REQUEST FOR PROPOSALS MAY BE FORTHCOMING. REQUESTED RESPONSE: Interested parties should provide a statement of interest on company letterhead (not to exceed 20 pages in length). The statement should include as a minimum the following criteria: (1) capability and experience in ownership, operation, maintenance and construction of similar potable water treatment and distribution and wastewater collection and treatment systems; (2) financial capacity to purchase, expand and operate the utility systems; (3) statement detailing the understanding of the obligation to serve in regards to continuous utility services; (4) statement detailing the legal right to serve, own, operate and maintain utility system within the state laws and an understanding of any applicable federal, territorial and local utility laws, regulations or franchise requirements affecting utilities in the state, and capability of complying with such requirements; (5) statement detailing the understanding of federal, state, and local environmental laws and regulations and familiarity and experience with environmental compliance procedures and regulations for the State of New York and the U. S. Environmental Protection Agency. Elaborate proposals or pricing information is neither required nor desired. Under no circumstances will cost data for the existing systems be provided. Any innovative and new conceptual ideas to achieve the stated objective are encouraged. If a site visit and the provision of additional data are later determined necessary, notification will be provided by way of an amendment to this announcement. It should be noted that the RFIs for different utility systems may be issued in the same time frame.
- Record
- Loren Data Corp. 20001218/ESOL002.HTM (W-349 SN5088U7)
| E - Purchase of Structures and Facilities Index
|
Issue Index |
Created on December 14, 2000 by Loren Data Corp. --
info@ld.com
|
|
|
|