Y -- Y -- NEW CONSTRUCTION OWNED, MAIN POST OFFICE, PINETOP, AZ
- Notice Date
- January 22, 2001
- Contracting Office
- United States Postal Service, Facilities Purchasing, Denver Facilities Service Office, 8055 E Tufts Ave Suite 400, Denver, CO, 80237-2881
- ZIP Code
- 80237-2881
- Solicitation Number
- 072976-01-A-0032
- Response Due
- February 20, 2001
- Point of Contact
- Tom Carriere, Facilities Contract Specialist, Phone (303) 220-6538, Fax (303) 220-6511, Email tcarrier@email.usps.gov -- Jae Pak, Purchasing Specialist, Phone (303) 220-6541, Fax (520) 222-4137, Email
- E-Mail Address
- Tom Carriere (tcarrier@email.usps.gov)
- Description
- Provide and pay for all materials, labor, services, equipment, licenses, taxes, and other items necessary for the execution, installation, and completion the construction of a new USPS owned main office facility of approximately 8,850 square feet in Pinetop, AZ on USPS owned property of approximately 95,500 square feet. The project is a USPS SSBD 80-A "owned" facility on USPS owned property. The work will include the complete construction of a new facility and improvement of the property. The work includes, but is not limited to: earthwork, installation of utilities, minimal work outside the USPS property line (for street, utilities, and sidewalk connection, which will require a City work order and permit), concrete curb and gutter, concrete and asphalt paving, minimal chainlink site fencing, landscaping with site irrigation (inclusive of coordination), furnished and installed USPS site signage, concrete sidewalks and ramps, concrete site retaining walls, masonry, stone veneer and plaster elevations, steel columns, wood trusses with plywood deck and metal roofing, USPS National Vendor millwork (furnished and installed by the Contractor), paint-striping, one scissors lift, forced-air interior mechanical units with exterior condensers, site lighting, structured wiring/equipment for CAT 5 communications systems, rough-in for IDS system, and all incidental work described in the contract documents. All National Vendor materials and installation shall be the responsibility of the General contractor within the cost for construction of the facility. Material costs shall be as indicated within the respective specification sections on the specific order forms. Installation cost and "manufacturing approved" subcontractors shall be provided through the contractor. Estimated construction cost range is between $1,400,000 and $1,700,000. The performance period is 210 calendar days after the notice to proceed is issued. ONLY THE FOLLOWING PRE-QUALIFIED FIRMS WILL BE ALOWED TO SUBMIT PROPOSALS: FCI Constructors, Inc., P.O. Box 41940, Phoenix, AZ 85080-1940; Telstar Construction, 8601 Washington NE, Suite A, Albuquerque, NM 87113-1685; SC Anderson, P.O. Box 81747, Bakersfield, CA 93308-1747; HB Construction, 8421 Washington Pl, NE, Albuquerque, NM 87113-1672; McCarthy Building Company, 302 North 1st Avenue, Suite 500, Phoenix, AZ, 85003-1551. Subcontractors may secure a copy of the plans and specifications from the prequalified contractors. Plans and specifications are also available from the Local Plan Rooms. Plans and specifications are available to other interested parties at a cost determined by the printer from A&D DRAFT-AID INC., P.O Box 40877, Denver, CO 80204-0877, (303) 573-5757, FAX (303) 573-8714. Mail check or money order payable to: A&D DRAFT-AID. Visa or Mastercard will be accepted. Mail or FAX your request with your credit card number to A&D DRAFT-AID. There will be no public opening of offers. All proposal information received is CONFIDENTIAL until award of a contract. The name of the successful offeror and the amount of the contract will be released as public information. The number of offerors, their names, and the amount of their offers WILL NOT BE RELEASED AS PUBLIC INFORMATION. This information is exempt from disclosure under Freedom of Information Act (FOIA) Exemption 4.*****
- Web Link
- Visit this URL for the latest information about this (/cgi-bin/WebObjects/EPS.woa/wa/SPF?A=P&P=072976-01-A-0032&L=3267)
- Record
- Loren Data Corp. 20010124/YSOL002.HTM (D-022 SN50B4O3)