COMMERCE BUSINESS DAILY ISSUE OF MARCH 20, 2001 PSA #2811
SOLICITATIONS
56 -- PROJECT: FJXT 00-1012
- Notice Date
- March 16, 2001
- Contracting Office
- Department of the Air Force, Air Mobility Command, 436th CONS, 639 Atlantic Street, Dover AFB,, DE, 19902-5639
- ZIP Code
- 19902-5639
- Solicitation Number
- Reference-Number-F07603BUILDING
- Response Due
- March 28, 2001
- Point of Contact
- Aisha Ross, Contract Specialist, Phone 302-677-5040, Fax 302-677-2907, Email aisha.ross@dover.af.mil -- Kenneth Palmer, Contract Specialist, Phone 302-677-5204, Fax 302-677-5105, Email
- E-Mail Address
- Aisha Ross (aisha.ross@dover.af.mil)
- Description
- Dover Air Force Base is conducting market research to determine if anyone may be interested in taking building 303,305,306 and 307, These building are modular type and are in very good condition. The following are the amounts we purchased these buildings for in 1987(including installation). 303 -- $194,900 305 -- $355,217 306 -- $355,217 307 -- $355,217 We are doing market research to determine: 1. If anyone will do the work below using the buildings as total or partial consideration. A BREIF DESCRIPTION OF THE WORK TO BE ACCOMPLISHED Three of the four building sit on concrete slabs about 3.3 feet below grade and concrete piers. All buildings have utilities connected, electrical utilities; will be disconnected by Dover Air force Base. The contractor in charge of the will disconnect water utilities servicing the building ant the water main and remove all pipes going to the main. All air conditioning and heating systems will removed with the building. Gas line will be removed up to the gas tanks. This contract will require the removal of the four modular buildings, removal of the specified sidewalks, demolition of the concrete steps and wood ramps to each building. Demolition of A/C concrete pads, CMU and concrete piers and demolition of the concrete slab will be necessary as well. All other materials, conduits and piping used in support for he modular will have to be removed. Holes on the ground left by the removal of the buildings and demolition of the concrete slab and concrete piers will have to fill to grade and seeded according to specifications. Once all work is completed, staging area and project site will be cleaned and returned to its original appearance All specifications and drawing of the building can be provided upon request. Also a site visit can be arranged. PLEASE RESPOND NLT 28 MAR 01. If you are interested or have any questions, please contact SSgt Aisha Ross at 302-677-5040 or email aisha.ross@dover.af.mil
- Web Link
- Visit this URL for the latest information about this (http://www.eps.gov/cgi-bin/WebObjects/EPS.woa/wa/SPF?A=R&P=Reference-Number-F07603BUILDING&L=536)
- Record
- Loren Data Corp. 20010320/56SOL002.HTM (D-075 SN50G4R7)
| 56 - Construction and Building Materials Index
|
Issue Index |
Created on March 16, 2001 by Loren Data Corp. --