COMMERCE BUSINESS DAILY ISSUE OF APRIL 30, 2001 PSA #2840
SOLICITATIONS
95 -- STEEL PIPE PILES FOR USCG GROUP ST. PETERSBURG, FL AND MIAMI BEACH, FL
- Notice Date
- April 26, 2001
- Contracting Office
- Department of Transportation, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit Miami, 15608 SW 117th Avenue, Miami, FL, 33177-1630
- ZIP Code
- 33177-1630
- Solicitation Number
- DTCG82-01-Q-3WC151
- Response Due
- May 16, 2001
- Point of Contact
- Michelle Nammur, Procurement Assistant, Phone 305-278-6725, Fax 305-278-6696, Email mnammur@ceumiami.uscg.mil
- E-Mail Address
- Michelle Nammur (mnammur@ceumiami.uscg.mil)
- Description
- AMENDMENT A001: The paragraph "STEEL PILE REQUIREMENTS" is changed as follows: "STEEL PILE REQUIREMENTS: All piles shall conform to ASTM A252. All piles shall be Grade 2 with plain ends and shall be straight seam welded. A MAXIMUM OF TWO (2) SPLICES PER PILE may be used if they are located within 10 feet of either end of the pile and tension test specimens from sample splices conform to the strength requirements of Table 1 of ASTM A252. Welds shall be ground down such that they are smooth and flush with the pile exterior. A certificate indicating that the piling was manufactured and tested in accordance with this specification shall be mailed to the Contracting Officer at the time of delivery. Steel piles shall be furnished in the lengths and diameters (outside) as listed in the contract. Pile length tolerance shall be (+/-) 3 inches. The wall thickness of all steel piles shall be 0.375 inches. The piles shall be coated as specified below."
- Web Link
- Visit this URL for the latest information about this (http://www.eps.gov/cgi-bin/WebObjects/EPS.woa/wa/SPF?A=M&P=DTCG82-01-Q-3WC151&L=490)
- Record
- Loren Data Corp. 20010430/95SOL004.HTM (D-116 SN50K4J4)
| 95 - Metal Bars, Sheets and Shapes Index
|
Issue Index |
Created on April 26, 2001 by Loren Data Corp. --
info@ld.com
|
|
|
|