COMMERCE BUSINESS DAILY ISSUE OF MAY 9, 2001 PSA #2847
SOLICITATIONS
Z -- CONSTRUCTION AND/OR RENOVATION TO BARNARD ELEMENTARY SCHOOL, MINER ELEMENTARY SCHOOL AND RANDLE HIGHLAND ELEMENTARY SCHOOL, FOR THE DISTRICT OF COLUMBIA PUBLIC SCHOOLS, WASHINGTON, DC
- Notice Date
- May 7, 2001
- Contracting Office
- Department of the Army, Baltimore District, Corps of Engineer, 10 South Howard Street, Room 7000, Baltimore, MD 21201-1715
- ZIP Code
- 21201-1715
- Solicitation Number
- DACW31-01-B-0016
- Response Due
- June 14, 2001
- Point of Contact
- Lydia A. Hill (202)529-2218,
- Description
- This acquisition is the second phase of the two-step acquisition process. Phase I was for pre-qualifications of contractors. That was accomplished under solicitation number DACW31-01-R-0011 (Construction and/or Renovation to Barnard Elementary School, Miner Elementary School and Randle Highlands Elementary School, for the District of Columbia Public Schools, Washington DC). Barnard is the third school for modernization/renovations as a result of the pre-qualifications. Under the Two-Step acquisition methods bids will only be accepted from the pre-qualified contractors. Interested parties are responsible for doing their own marketing. The project description as originally published under DACW31-01-R-0011 is repeated for information: BARNARD ES: Project consists of demolition of existing 67,000 square foot multi-story Barnard Elementary School located at 430 Decatur Street, N.W. Washington, D.C. and construction of a new 72,500 square foot multi-story elementary school. The new facility will have a capacity for 520 students and will consist of.- 25 academic classrooms, administrative support space, cafeteria, multi-use facility, music/art rooms, extensive information technology, self contained HVAC system and site improvements (landscaping, facility/visitor parking, and bus pick up and drop off areas) for 3.44 acre site. The new school is expected to be a steel frame structure, with masonry exterior walls. The exterior will be mainly brick veneer and glass, with areas of pre-cast concrete, metal panels, and other materials for aesthetics. The construction will be performed in three (3) phases: Phase I will consist of construction of new foundations and erection of structural steel, Phase II -- will consist of construction of new building envelope, finishing out all interior spaces, installing all utility systems and HVAC system; and Phase III -- will consist of demolishing the existing 67,000 square foot facility. Phases I and II will be accomplished while the existing school remains occupied. Estimated cost of construction (total for all 3 phases) is between $10,000,000 and $20,000,000. Construction completion (for all 3 phases) is not later than 330 calendar days.THE PRE-QUALIFIED CONTRACTORS ARE: James G. Davis Construction Corp., 12500 Parklawn Dr., Rockville, MD 20852; Hess Construction Co., 704 Quince Quhard Rd., Gaithersburg, MD 20878; Manhattan Construction Co., 8550 Arlington Blvd., Fairfax, VA 22031; W.M. Schlosser Co., Inc., 2400 51st Pl., Hyattsville, MD 20781; Sigal Construction Corp. 3299 K St., NW, Washington, DC 20007; The Whiting-Turner Contracting Co., 7475 Wisconsin Ave., Bethesda, MD 20814; Coakley-Williams Construction, 16 S. Summit Ave., Gaithersburg, MD 20877 Turner Construction Company, 4601 N. Fairfax Dr., Arlington, VA 22203, John C. Grimberg Company, 5501 Randolph Rd., Rockville, MD 20852
- Record
- Loren Data Corp. 20010509/ZSOL016.HTM (W-127 SN50L463)
| Z - Maintenance, Repair or Alteration of Real Property Index
|
Issue Index |
Created on May 7, 2001 by Loren Data Corp. --
info@ld.com
|
|
|
|