Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF MAY 9, 2001 PSA #2847
SOLICITATIONS

Z -- CONSTRUCTION AND/OR RENOVATION TO BARNARD ELEMENTARY SCHOOL, MINER ELEMENTARY SCHOOL AND RANDLE HIGHLAND ELEMENTARY SCHOOL, FOR THE DISTRICT OF COLUMBIA PUBLIC SCHOOLS, WASHINGTON, DC

Notice Date
May 7, 2001
Contracting Office
Department of the Army, Baltimore District, Corps of Engineer, 10 South Howard Street, Room 7000, Baltimore, MD 21201-1715
ZIP Code
21201-1715
Solicitation Number
DACW31-01-B-0016
Response Due
June 14, 2001
Point of Contact
Lydia A. Hill (202)529-2218,
Description
This acquisition is the second phase of the two-step acquisition process. Phase I was for pre-qualifications of contractors. That was accomplished under solicitation number DACW31-01-R-0011 (Construction and/or Renovation to Barnard Elementary School, Miner Elementary School and Randle Highlands Elementary School, for the District of Columbia Public Schools, Washington DC). Barnard is the third school for modernization/renovations as a result of the pre-qualifications. Under the Two-Step acquisition methods bids will only be accepted from the pre-qualified contractors. Interested parties are responsible for doing their own marketing. The project description as originally published under DACW31-01-R-0011 is repeated for information: BARNARD ES: Project consists of demolition of existing 67,000 square foot multi-story Barnard Elementary School located at 430 Decatur Street, N.W. Washington, D.C. and construction of a new 72,500 square foot multi-story elementary school. The new facility will have a capacity for 520 students and will consist of.- 25 academic classrooms, administrative support space, cafeteria, multi-use facility, music/art rooms, extensive information technology, self contained HVAC system and site improvements (landscaping, facility/visitor parking, and bus pick up and drop off areas) for 3.44 acre site. The new school is expected to be a steel frame structure, with masonry exterior walls. The exterior will be mainly brick veneer and glass, with areas of pre-cast concrete, metal panels, and other materials for aesthetics. The construction will be performed in three (3) phases: Phase I will consist of construction of new foundations and erection of structural steel, Phase II -- will consist of construction of new building envelope, finishing out all interior spaces, installing all utility systems and HVAC system; and Phase III -- will consist of demolishing the existing 67,000 square foot facility. Phases I and II will be accomplished while the existing school remains occupied. Estimated cost of construction (total for all 3 phases) is between $10,000,000 and $20,000,000. Construction completion (for all 3 phases) is not later than 330 calendar days.THE PRE-QUALIFIED CONTRACTORS ARE: James G. Davis Construction Corp., 12500 Parklawn Dr., Rockville, MD 20852; Hess Construction Co., 704 Quince Quhard Rd., Gaithersburg, MD 20878; Manhattan Construction Co., 8550 Arlington Blvd., Fairfax, VA 22031; W.M. Schlosser Co., Inc., 2400 51st Pl., Hyattsville, MD 20781; Sigal Construction Corp. 3299 K St., NW, Washington, DC 20007; The Whiting-Turner Contracting Co., 7475 Wisconsin Ave., Bethesda, MD 20814; Coakley-Williams Construction, 16 S. Summit Ave., Gaithersburg, MD 20877 Turner Construction Company, 4601 N. Fairfax Dr., Arlington, VA 22203, John C. Grimberg Company, 5501 Randolph Rd., Rockville, MD 20852
Record
Loren Data Corp. 20010509/ZSOL016.HTM (W-127 SN50L463)

Z - Maintenance, Repair or Alteration of Real Property Index  |  Issue Index |
Created on May 7, 2001 by Loren Data Corp. -- info@ld.com