Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 21, 2001 PSA #2919
SOLICITATIONS

R -- PUBLISHING LEGAL MATERIALS/FORMAL OPINIONS FOR EPA'S ENVIRONMENTAL ADMINISTRATIVE DECISIONS (E.A.D.), VOLUME 9

Notice Date
August 17, 2001
Contracting Office
Program Contracts Service Center (3803R), Environmental Protection Agency, Ariel Rios Building, 1200 Pennsylvania Avenue, NW, Washington, DC 20460
ZIP Code
20460
Solicitation Number
RFQ-DC-01-00270
Response Due
August 28, 2001
Point of Contact
Ms. Sharon D. Hargrove, Contracting Officer, 202-564-4764
E-Mail Address
Contracting Officer (hargrove.sharon@epa.gov)
Description
The U.S. Environmental Protection Agency (U.S. EPA) intends to award a firm fixed price purchase order using the Simplified Acquisition Procedures of the Federal Acquisition Regulation (FAR) Part 13. This is a synopsis (RFQ-DC-01-00270) for services in accordance with FAR Subpart 13.1, as supplemented with additonal information included in this notice and the RFQ. STATEMENT OF WORK: SCOPE -- Volume 9 is the ninth volume in a series of bound volumes of formal legal opinions issued by the Environmental Appeals Board (EAB) of the U.S. Environmental Protection Agency. These formal opinions contain numerous legal citations and footnotes. The contractor should have experience in publishing legal materials. The volume will total approximately 1100 pages in manuscript, consisting of the following: (1) Cover page; (2) Tables (approximately 40 pages); (3) Text pages (approximately 1000 pages in Corel Word Perfect 8, consisting of the 27 formal opinions listed below); (4) Subject index (approximately 30 pages). The format of the text pages, tables, and subject index must exactly match the format of the previously published volumes in the series as to page layouts, fonts, type sizes, placement of materials on the printed page, etc. Copies of pages from a previously published volume are attached as examples of the required format. Final Products (1) Camera copy for volume 9 that meets U.S. Government Printing Office requirements for duplication and binding Page size: 6" x 9-1/6" (per sample) Font: Garamond Point size: Headings: 14 point Bold Text: 10 point Margins: Per sample (2) Camera copy for the cover and spine of volume 9 (3) A PDF file for each of the 27 formal opinions that will appear in the volume, with pagination that is identical to the camera copy (4) A duplicate set of the final page proofs of the text pages (described in Nature of Publication), with pagination identical to the final camera copy, that the EAB can send to a professional indexer for use in creating the tables and subject index for the volume. Publication Schedule 1. EAB will send Contractor the 27 formal opinions (both in manuscript and electronic files) that will comprise the text pages for the volume. Electronic files will be either in Corel Word Perfect 8.0 or PDF, at the Contractor's option. 2. Contractor will provide EAB with sample page proofs for several pages (so that the EAB can review the format) within five working days of receiving the text pages. 3. EAB will return the sample page proofs within three working days after receiving them. 4. Contractor will provide EAB with First Proofs of the text pages within 15 working days after OK of sample page proofs. 5. EAB will note corrections and revisions on First Proofs and will return the first Proofs within 10 working days after receiving them. 6. EAB will require the Contractor to revise up to several hundred case citations. EAB has noted a large percentage of these required revisions in pencil on the manuscript versions of the opinions but expects the Contractor to make these revisions on the electronic versions of the opinions. The EAB will be unable to mark all of the revisions until the final pagination of the volume is fixed, since the page references for these revisions will not be known until the final pagination of the volume is fixed. The Contractor may elect to make the revisions that EAB has already marked on the manuscript versions of the opinions before sending First Page Proofs to the EAB or may wait and make all of the revisions at the same time after the EAB has provided the remaining revised citations to the Contractor. 7. Contractor will provide Second Page Proofs within 10 working days after return of First Page Proofs. 8. Contractor will provide any Additional Proofs, as necessary, within 5 working days after return of previous page proofs. 9. Contractor will provide a duplicate set of the Final Page Proofs that the EAB can send to its professional legal indexer. (The first set of Final Page Proofs will be returned to the Contractor with the EAB's approval to create camera copy.) 10. EAB will send the Contractor the tables, and subject index (comprising approximately 70 pages), both on disk and in manuscript, and the text of the cover and spine, in manuscript, sometime after the EAB has approved Final Page Proofs of the text pages.. 11. Contractor will send First Page Proofs of the spine, contents page, tables, and subject indexer to the EAB within 15 working days after receiving them from the EAB, and will send any subsequent page proofs to the EAB within 10 working days of receiving the page proofs back from the EAB. Special Instructions 1. The contractor will make the following alterations to the electronic copy provided by the EAB: (a) Add page headers, footers, and page numbers; (b) Delete the cover page and the Certificate of Service (if included) for each opinion; (c) Begin each opinion at the top of a page; (d) Add the case title, appeal number, type of decision, and date at the beginning of each opinion, conforming to the format of the sample. 2. Paginate text pages beginning with 1 in the upper right hand corner, continue numbers in top outside corner of every page (per sample) 3. Left hand text pages have the header "ENVIRONMENTAL ADMINISTRATIVE DECISIONS" 4. Right hand text pages have the case name in upper case as the header 5. Volume number appears in all upper case letters as a footer on all pages 6. The 27 opinions to appear in the volume in the order of their date of issuance, with each new opinion starting at the top of a page. 7. The page formats, and all fonts and type sizes, to be identical to the samples provided by the EAB. 8. Page numbers in reference tables to be lower case Roman numerals (per sample). 9. Camera copy for the front cover and spine of the bound volume to match the the sample exactly with regard to the type size and font, layout, and the size, style, and placement of the EPA seal. Horizontal bars on the spine must match the exact position of horizontal bars on the spines of the sample volume. Formal opinions to be published in volume 9 Page count 1. Knauf Fiber Glass, GmbH, PSD Appeal Nos. 99-8 26 through 99-72 (Mar. 14, 2000) 2. U.S. Department of Navy, (Kingsville Naval Station), 19 TSCA Appeal No. 99-2 (Mar. 17, 2000) 3. E.I. Du Pont de Nemours and Co., 43 FIFRA Appeal No. 98-2 (Apr. 3, 2000) 4. BWX Technologies, Inc., RCRA (3008) 31 Appeal No. 97-5 (Apr. 5, 2000) 5. Pepperell Associates, CWA Appeal Nos. 99-1 51 & 99-2 (May 10, 2000) 6. Chempace Corp., FIFRA Appeal Nos. 99-2 & 99-3 38 (May 18, 2000) 7. Tifa Limited, FIFRA Appeal No. 99-5 (June 5, 2000) 29 8. Steel Dynamics, Inc., PSD Appeal Nos. 99-4 & 99-5 112 (June 22, 2000) 9. Puna Geothermal Venture, UIC Appeal Nos. 99-2 53 through 99-5 (June 27, 2000) 10. American Soda, LLP., UIC Appeal Nos. 00-1 31 & 00-2 (June 30, 2000) 11. Spitzer Great Lakes Ltd., TSCA Appeal No. 99-3 30 (June 30, 2000) 12. Sultan Chemists, Inc., FIFRA Appeal No. 99-7 49 (Sept. 13, 2000) 13. Tennessee Valley Authority, CAA Docket No. 00-6 187 (Sept. 15, 2000) 14. Rohm and Haas Co., RCRA Appeal No. 98-2 22 (Oct. 5, 2000) 15. City of Phoenix, Arizona, NPDES Appeal No. 99-2 27 (Nov. 1, 2000) 16. Rogers Corp., TSCA Appeal No. 98-1 59 (Nov. 28, 2000) 17. Bil-Dry Corp., RCRA (3008) Appeal No. 98-4 61 (Jan. 18, 2001) 18. The Bullen Companies, Inc., FIFRA Appeal No. 99-14 22 (Feb. 1, 2001) 19. Allegheny Power Service Corp., CAA Appeal No. 99-4 35 (Feb. 15, 2001) 20. Town of Ashland Wastewater Treatment Facility, 17 NPDES Appeal No. 00-15 (Feb. 23, 2001) 21. Microban Prod. Co., FIFRA Appeal No. 99-13 23 (Feb. 23, 2001) 22. Carlton, Inc., PSD Appeal No. 00-9 (Feb. 28, 2001) 6 23. DPL Energy, PSD Appeal No. 01-02 (Mar. 13, 2001) 7 24. Zion Energy, L.L.C., PSD Appeal No. 01-01 13 (Mar. 27, 2001) 25. Tondu Energy Co., PSD Appeal Nos. 00-5 & 00-7 22 (March 28, 2001) 26. New England Plating Co., NPDES Appeal No. 00-7 20 (Mar. 29, 2001) 27. Steel Dynamics, Inc., PSD Appeal No. 01-03 (Apr. 23, 2001) 35 For copies of the complete Request for Quotation, please Email the Contracting Officer at "hargrove.sharon@epa.gov". The Contracting Officer can also be reached at 202-564-4764. Quotes are due IN WRITING no later than 3:00p.m.(EST), 28 August 2001. An original and one copy of all quotations should be delivered to the following address (fax/e-mail copies will not be accepted): U.S. EPA, 1200 Pennsylvania Ave., N.W., Mail Code 3803R, Washington, DC 20460 (Attn: Ms. Sharon Hargrove)HANDCARRY ADDRESS TO -- -1300 Pennsylvania Ave., N.W., Bid and Proposal Room, 6th Floor, Washington, DC 20003 (Attn: Ms. Sharon Hargrove).
Web Link
R -- PUBLISHING LEGAL MATERIALS/FORMAL OPINIONS FOR EPA'S (hargrove.sharon@epa.gov)
Record
Loren Data Corp. 20010821/RSOL008.HTM (W-229 SN50V2S9)

R - Professional, Administrative and Management Support Services Index  |  Issue Index |
Created on August 17, 2001 by Loren Data Corp. -- info@ld.com