Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 26, 2001 PSA #2965
SOLICITATIONS

C -- C -- ARCHITECT/ENGINEERING FOR MULTIPLE AWARD MISCELLANEOUS DESIGN, PLANNING, AND STUDIES AT BOP CORRECTIONAL INSTITUTIONS NATIONWIDE AND CENTRAL OFFICE NATIONAL FACILITIES PROGRAMS

Notice Date
October 24, 2001
Contracting Office
Department of Justice, Bureau of Prisons, Construction Contracting, 320 First Street, NW, Room 5006, Washington, DC, 20534
ZIP Code
20534
Solicitation Number
RFPX00-0457
Response Due
November 5, 2001
Point of Contact
Shereen Turner, Contracting Officer, Phone 202-307-0954, Fax 202-616-6055, Email sturner@bop.gov
Description
The orginal Submission No. 50Z1T7, posted in the CBDNet, dated September 28, 2001, for SOL RFP X00-0457, has been modified to reflect the following: Change the order of importance of the technical evaluation criteria. (1) Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials -- as may be demonstrated by the following: a. experience in Federal long range master planning, b. experience in Federal physical plant and infrastructure surveys, c. experience in Prisons and Correctional Facilities, d. experience in Federal historic preservation studies, documentation, renovation and rehabilitation design, e. experience in design of Federal renovation, rehabilitation, and repair projects, and f. experience in design of new Federal construction projects; (3) Capacity to accomplish the work in the required time -- as may be demonstrated by the following: a. documented successful experience in meeting established project schedules, b. the firms?s ability and experience with computer assisted design and engineering, c. the firm?s capacity and ability to successfully manage subcontractors and consultants, and d. discussion of the firm?s current workload; (4) Acceptability under other appropriate evaluation criteria as required by the FBOP. Other evaluation criteria include the following: a. acceptability of the established team of key personnel of licensed or otherwise certified professionals that shall remain intact for performing long range master planning efforts for the duration of this contract, b. the firms?s ability to provide master planning documentation and analyses consistent with established formats, c. experience performing sustainable design, and d. experience performing/managing effective quality control programs. Previous experience of the established long range master plan team members working together as a team performing master planning efforts is highly desirable; (5) Professional qualifications necessary for satisfactory performance of required services -- as may be demonstrated to support Facilities Programs for Life Safety, Environmental Issues, Design Compliance, Energy Management, Accessibility, Historic Preservation, and Long Range Master Planning; and (6) Location in the general geographical area of the project and knowledge of the locality of the project, provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project -- as may be demonstrated by referenced project work experience nationwide. =20
Web Link
Visit this URL for the latest information about this (http://www.eps.gov/spg/DOJ/BPR/CC/RFPX00-0457/listing.html)
Record
Loren Data Corp. 20011026/CSOL001.HTM (D-297 SN5114N9)

C - Architect and Engineering Services - Construction Index  |  Issue Index |
Created on October 24, 2001 by Loren Data Corp. -- info@ld.com