AWARD
Z -- RECOVERY--Z--Kodachrome Road Improvements, Clark County, Nevada
- Notice Date
- 1/22/2010
- Notice Type
- Award Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- US Army Corps Of Engineers, Los Angeles, P.O. Box 532711, Los Angeles, CA 90053-2325
- ZIP Code
- 90053-2325
- Solicitation Number
- W912PL-10-D-0013-0001
- Response Due
- 1/21/2010
- Archive Date
- 3/22/2010
- Point of Contact
- Tracey Daggy, (213)452-3239
- E-Mail Address
-
US Army Corps Of Engineers, Los Angeles
(tracey.i.daggy@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PL-10-D-0013-0001
- Award Date
- 1/21/2010
- Awardee
- BARAJAS & ASSOCIATES, INC. (176184307)<br> 2965 W LAKE MEAD BLVD<br> NORTH LAS VEGAS, NV 89032-4871
- Award Amount
- $42,304.00
- Line Number
- 0001-0006
- Description
- This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures. 1. GENERAL WORK REQUIREMENTS: The Contractor shall provide all labor, material, and equipment necessary to perform the following Task Order Scope of Work for improving Kodachrome Road within the Rainbow Gardens Area of Critical Environmental Concern (ACEC) and Sunrise Management Area (SMA) in Clark County, Nevada. The Scope-of-Work for this Task Order includes coordination of a site meeting and reconnaissance with Bureau of Land Management (BLM) and Corps of Engineers personnel to review project requirements and constraints, and development of a Work Plan for reconstruction of the road to return it to a safe drivable condition. This Scope-of-Work generalizes major work elements and is not all inclusive. The Government will rely on the Contractor's expertise and experience to develop a written Work Plan describing the necessary actions to successfully reconstruct Kodachrome Road, and to execute this contract. The Contractors proposal shall initially provide a cost for coordinating the site meeting and reconnaissance, preparing the Work Plan for performing the road improvements, and developing a schedule based on the Work Plan. Based on the approved Work Plan or approved variation, the cost for reconstruction of Kodachrome Road will be negotiated as a modification to the Task Order. Work under this Task Order shall be performed in accordance with the specification requirements shown in the basic Performance Oriented Construction Activity (POCA) contract. 2. CLIN 0001, BASE TASK, COORDINATE SITE MEETING AND RECONNAISSANCE, DEVELOP WORK PLAN: Coordinate a site meeting and reconnaissance with BLM and Corps of Engineers personnel to review project requirements and constraints. Prepare a work plan to define the drainage, grading, slope, and environmental requirements in order to accomplish the work, as stated in Section 01000, Paragraph (7) (d) (2), of the basic contract. 3. PRICE PROPOSAL REQUIREMENTS: The price proposal shall include a cost proposal, a proposal narrative, and a proposal schedule. 3.1 Cost Proposal: The cost proposal shall include a table of contents and the information specified in Specification Section 01000, Paragraph 4, of the basic contract. The costs are to be provided in sufficient detail to allow the government to evaluate the costs. 3.2 Proposal Narrative: A written proposal narrative shall be prepared and submitted as part of the price proposal. The narrative shall include a scope of work and a detailed description of the actions required to complete the Work Plan. 3.3 Proposal Schedule: A proposal schedule shall be prepared and submitted as part of the price proposal. The proposal schedule shall be in the form of a progress or bar chart of suitable scale and show both series and parallel tasks leading to completion of the Work Plan.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA09/W912PL-10-D-0013-0001/listing.html)
- Record
- SN02048060-W 20100124/100122235911-b625aff0a326fd2b3c98b8fad94ca47a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |