Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 11, 2010 FBO #3001
SOLICITATION NOTICE

Z -- RECOVERY - LOLO WEST ZONE BRIDGE REPLACEMENT - LOLO NATIONAL FOREST

Notice Date
2/9/2010
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
 
ZIP Code
80401
 
Solicitation Number
AG-82B1-S-10-0196
 
Archive Date
4/13/2010
 
Point of Contact
Wilton W. Webb, Phone: 3032755860
 
E-Mail Address
wwebb@fs.fed.us
(wwebb@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
RECOVERY - West Zone Bridge Repairs - This project will repair two (2) bridges on the west zone of the Lolo National Forest. One bridge is located on FH 56, Thompson River road, at MP 6.50, West fork Thompson River. The bridge will have both (2) timber span sections replaced, as well as the sills and backwalls for these spans. The running planks, curb, and steel rail will be replaced on the entire bridge and approach rail on south end. The other bridge is located near Haugan, MT on FSR 386, Big Creek road, at MP 1.20, Big Creek. This bridge will have the timber caps replaved at both abutments. This bridge will have the treated timber caps removed and replaced with glu-lam treated timber caps. This work will require removal of brace and drift bolts prior to the jacking and removal and replacement of caps. The bridge on FH 56, Thompson River road is located approximately 12 miles ENE of Thompson Falls, NT. Approximately 5 miles east of Thompson Falls on Highway 200, turn north onto FH 56, and the project is located at MP 6.5, West Fork Thompson River Bridge. The bridge on FSR 386, Big Creek road, is located 1.5 miles south of Haugan, MT. From the I90 interchange, proceed south on FSR 386 to MP 1.2, Big Creek Bridge site. There is no pre-bid/pre-conference scheduled for this effort. Questions regarding the project may be directed to Nate Kegel, Superior Ranger District, at (406) 822-3927. The project cost estimate is between $25,000 and $100,000. Performance and payment bonds will be required per the Miller Act and Davis Bacon wage rates will apply. All responsible sources may submit a bid which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http://www.ccr.gov//. THE SOLICITATION PACKAGE AND ALL SPECIFICATIONS WILL BE POSTED ON 25 FEBRUARY 2010.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/93d0c9767be8b9c87b8464701b4d1e1c)
 
Place of Performance
Address: BUILDING 24-A, FORT MISSOULA, MISSOULA, Montana, 59804, United States
Zip Code: 59804
 
Record
SN02061092-W 20100211/100209234422-93d0c9767be8b9c87b8464701b4d1e1c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.