Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 18, 2023 SAM #7753
AWARD

Y -- 549A4-20-700 - Replace Chillers at Energy Center (VA-23-00004053)

Notice Date
2/16/2023 4:56:29 AM
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
257-NETWORK CONTRACT OFFICE 17 (36C257) ARLINGTON TX 76006 USA
 
ZIP Code
76006
 
Solicitation Number
36C25723B0009
 
Archive Date
03/18/2023
 
Point of Contact
Joyce M Mills, Contract Specialist, Phone: 254-899-6026
 
E-Mail Address
joyce.mills@va.gov
(joyce.mills@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Award Number
36C25723C0048
 
Award Date
02/21/2023
 
Awardee
ROCK JV, LLC GARDEN CITY 64747
 
Award Amount
2075000.00000000
 
Description
Award Notice: resulting from solicitation 36C25723B0009; Network Contracting Office, NCO17, has awarded a Firm-Fixed-Price construction contract, 36C25723C0048, Replace Chillers at Energy Center, Project No. 549A4-20-700, located at the Sam Rayburn Memorial Veterans Center (VAMC), 1201 East 9th Street, Bonham, TX 75418. Contract Requirements: Contractor shall provide all necessary labor, materials, equipment and supervision to completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Project Replace Chiller at Bldg. 11 Boiler Plant, as required by provide SOW, Specification and Drawings. Work includes general construction, demolition, and alterations necessary for replacement of existing chiller, pumps and associated appurtenances, and installation of new chiller, pumps and associated appurtenances, including the necessary removal of existing structures, equipment pads and construction of certain other items. Electrical Work: Work includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project as indicated in the construction documents. Mechanical Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical construction work on this project as indicated in construction documents. All work shall be performed during normal working hours, Monday Friday, 7:30am 5:00pm. Project duration shall be 365 calendar days from receipt of the Notice to Proceed (NTP). **NOTE: For Subcontracting opportunities, please contact the Prime Contractor: Rock JV, LLC 34911 S. Bramblin Road, Garden City, MO 64747, 816-550-4557.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3070e62198e64fa2a3af2f9105698f1f/view)
 
Record
SN06593187-F 20230218/230216230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.