Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 22, 2024 SAM #8335
SOLICITATION NOTICE

Y -- P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA

Notice Date
9/20/2024 3:07:15 PM
 
Notice Type
Solicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
NAVFACSYSCOM SOUTHWEST SAN DIEGO CA 92132-0001 USA
 
ZIP Code
92132-0001
 
Solicitation Number
N6247324R5227
 
Response Due
9/27/2024 2:00:00 PM
 
Archive Date
12/30/2025
 
Point of Contact
Kathryn Cranford, Phone: 6197054644, Victor Mariscal, Phone: 6197054657
 
E-Mail Address
kathryn.r.cranford.civ@us.navy.mil, victor.m.mariscal.civ@us.navy.mil
(kathryn.r.cranford.civ@us.navy.mil, victor.m.mariscal.civ@us.navy.mil)
 
Description
This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d1156d29bbaa4756831ed7e432e002a2/view)
 
Place of Performance
Address: Twentynine Palms, CA 92277, USA
Zip Code: 92277
Country: USA
 
Record
SN07219597-F 20240922/240920230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.