Z -- 528-24-126 Pharmacy Compounding HVAC Renovations

Notice Date
8/4/2025 6:51:25 AM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24225B0047
 
Response Due
8/28/2025 9:30:00 AM
 
Archive Date
10/27/2025
 
Point of Contact
Devan Bertch, Contract Specialist
 
E-Mail Address
Devan.Bertch@va.gov
(Devan.Bertch@va.gov)
 
Awardee
null
 
Description
528-24-126 Pharmacy Compounding HVAC Renovations 1 of 13 5/1/2025 Construction Scope of Work Pharmacy Compounding HVAC Renovations Project 528-24-126 01 May 2025 General Information Location Work performed under this scope will be for and conducted within VA Western New York Healthcare System (VAWNYHS) at the Buffalo VA Medical Center (VAMC) located at 3495 Bailey Avenue Buffalo, NY 14215 under VA Project Number 528-24-126. Purpose The purpose of this effort is to replace the Pharmacy Compounding Hood and perform partial HVAC system renovations at the Buffalo VAMC in accordance with the construction documents developed by the Buffalo VAMC. The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. Scope The scope of construction work is fully described in the construction documents (drawings and specifications) and within this Scope of Work Document. Additional administrative and management related requirements are described in Section 3: Requirements. A brief overview of the construction work is included below: A detailed phasing plan with non-business hour (including but not limited to nights, weekends, and holidays) requirements General demolition of HVAC and Electrical Systems. Remove and dispose of existing Pharmacy Compounding Hood. Install Pharmacy Compounding Hood with options and accessories furnished by VAMC. Remove and dispose of existing roof-mounted exhaust fans. Install Exhaust Fans with select options and accessories furnished by VAMC. Contractor shall be responsible for options, accessories, and ancillary devices not explicitly defined as VAMC responsibility to ensure a complete and operable installation. Partial modification of interior ductwork systems. HVAC system testing, adjusting, balancing (TAB). HVAC system functional testing/ commissioning. Rough-in work for BMS as indicated in contract documents. Existing Electrical System modifications/ renovations. Furnishment and installation of electrical devices including but not limited to variable frequency drives, exterior disconnects, raceways, wiring, etc. Period of Performance (PoP) The contract period of is anticipated to be 90 days (3 months). Site Conditions, As-Built and Record Documents Although the VA makes every effort to keep drawings current to existing conditions, changes and updates are sometimes not recorded. It is therefore the Contractor s responsibility to perform field investigation and verify of the accuracy of the drawings with the actual conditions. The Contractor shall check existing conditions at the project site prior to bidding. Quality Assurance/Quality Control Plan The Contractor is responsible for reviewing the work done by any subcontractors that the Contractor has hired to assist with the completion of this SOW. The Contractor must provide the Government with a Quality Assurance/Quality Control (QA/QC) Plan that documents the methods, processes, procedures that are going to be implemented by the Contractor to validate the work their subcontractors perform. Hazardous Materials The VA does not anticipate any Hazardous Material Removal for this project. There are locations in the VA where asbestos does exist. If suspect material is identified by the Contractor, the Contractor should stop work and notify the VA COR immediately. Personal Protective Equipment (PPE) The Contractor is responsible for obtaining/providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) and access equipment (lifts, scaffolding, etc...) necessary to perform services identified in this SOW. Approach General This Scope of Work has been broken down into general requirements that are applicable to the entire contract and the specific construction effort: General (Section 3.1) Construction (Section 3.2) The bidding Contractor(s) will have to conduct a brief pre award site survey of the campus. This will be arranged through the contracting officer and conducted as a group or individually as per the contracting officer. Phasing This is a phased project. See phasing drawings and PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 01 00 00 GENERAL REQUIREMENTS - 528-24-126 for phasing requirements. Site Information Safety All Contractor personnel working onsite at the Medical Center will be required to attend a 1-hour Buffalo VAMC site specific safety training class. This class will be held on site and will be taught by a member of the Buffalo VAMC safety office. Attendance to this class and proof of the 10-hour OSHA requirement will allow Contractor personnel to obtain a photo ID badge from the Buffalo VAMC Police. All Contractor personnel shall wear this badge above the waist at all time while on the Buffalo VAMC campus. Participation in this class is mandatory and must be done prior to the commencement of work on-site. The training and the badge will be valid for 3 years from the date of issue. If this training has been completed previously (as evidenced by a valid Buffalo VAMC Contractor Photo ID) then no repeat training will be required until the printed expiration date. Personnel must attend the safety training class to renew an existing badge. Access Although the VAWNYHS campuses are public facilities, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the general public. Accessing these areas may require advance notice, pre-approval, and scheduling to gain entry. All visits and access requests to the VAWNYHS under this scope of work shall be coordinated through the Contracting Officer Representative (COR). Photography PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 01 00 00 GENERAL REQUIREMENTS - 528-24-126, Article 1.31 requires the contractor to obtain the services of a professional photographer to document the entire construction process. As a reminder, it is VHA policy to respect the privacy of all persons (e.g., Veterans, patients, residents, members of the VHA workforce, and visitors) consistent with the needs of operating a national health care system. Privacy protections on VHA premises vary according to the needs and purposes of different types of areas, the persons included, and the purpose of the production and use of photographs, digital images, and video or audio recordings (excerpt from VHA Directive 1078). The Contractor shall ensure that any photographs taken do NOT include any VHA patients, members of the VHA workforce, or visitors to the VAMC facility. Applicable Documents The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 of this SOW, whether or not they are listed here. Government Documents The following directives, guides, handbooks, and drawings form a part of this document to the extent specified herein. Unless otherwise specified, the latest revisions available shall be used. Copies of construction related Department of Veterans Affairs directives, guides, and handbooks are available from the Office of Construction and Facilities Management website: http://www.cfm.va.gov/til/index.asp DEPARTMENT OF VETERANS AFFAIRS DIRECTIVES 1078 PRIVACY OF PERSONS REGARDING PHOTOGRAPHS, DIGITAL IMAGES, AND VIDEO OR AUDIO RECORDINGS Veterans Health Administration Western New York Documents The following drawings and documents form a part of this document to the extent specified herein. Documents identified as AS MODIFIED FOR VA PROJECT 528-24-126 are base VA documents that have been tailored to the needs of this specific effort. While the base VA documents are available on the Office of Construction and Facilities Management website listed above, the Contractor shall use the modified version listed below, NOT the base document. Copies of these documents are available from the CO, COR, or Technical POC. VA WESTERN NEW YORK HEALTHCARE SYSTEM, BUFFALO VA MEDICAL CENTER DRAWINGS PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 00 01 15 LIST OF DRAWING SHEETS (AS MODIFIED FOR VA PROJECT 528-24-126) lists all drawings for this construction effort. SPECIFICATIONS (AS MODIFIED FOR VA PROJECT 528-24-126) PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION (TOC) TABLE OF CONTENTS (AS MODIFIED FOR VA PROJECT 528-24-126) lists all relevant and modified construction specifications for this construction effort. Non-Government Publications All work shall be accomplished in strict accordance with the latest codes and standards. The Contractor shall follow any/all applicable standards and codes, including, but not limited to applicable NFPA standards, NEC, JCAHO, OSHA, ANSI, ASHRAE, and any other codes. Order of Precedence In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Records Management 1. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. 2. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. 3. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. 4. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. 5. The Government Agency owns the rights to all data/records produced as part of this contract. 6. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. 7. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format (paper, electronic, etc.) or mode of transmission (email, fax, etc.) or state of completion (draft, final, etc.). 8. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. 9. Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. Requirements The Contractor shall provide personnel, material, services, and facilities to perform, accomplish, and deliver the required services detailed in this scope of work. General This section contains general information that is applicable for the duration of the contract. Construction Documentation Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform. Status Updates The Contractor shall prepare and submit periodic status reports throughout the duration of the contract. The reporting period will begin at Notice to Proceed. The contents of status reports shall include but is not limited to the following information/topics: Summary and Current Status of Project Progress Accomplished (for the previous month) Progress Anticipated (for the next three months) Updated Schedule Problems Encountered and Anticipated Technical, Schedule, and Cost Risk Assessment Risk Mitigation Strategy Financial Data (i.e. allocated funding, obligations, expenditures, etc.) Status reports may be organized in Contractor specified format. Status reports will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). Status reports shall be submitted via email to the KO and COR by the 5th business day of every month. Meetings Several different meetings are identified under this contract. Information contained within this section is relevant to all meetings identified in this contract. Any meeting specific details can be located in its respective section of this SOW. Meeting Scheduling All meetings identified within this SOW are to be coordinated and scheduled with the COR. See Section 1.5.2 and Section 5.1 for more details. Meeting Agenda The Contractor shall provide a meeting agenda 5 business days prior to the scheduled date of the meeting. Meeting agendas may be organized in Contractor specified format. Meeting agendas will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). Meeting agendas shall be submitted via email to the COR. Meeting Presentation Materials Any required presentation materials (e.g. handouts, slide presentation, design information, drawings, schedules, cut sheets, etc ) shall be provided to the Government at the same time as the meeting agenda. Meeting presentation materials may be organized in Contractor specified format. Meeting presentation materials will be supplied as a digital product to the Government in a Microsoft Office compatible format (*.DOC, *.DOCX, *.PPT, *.PPTX), Portable Document Format (*.PDF), or AutoCAD (*.DWG, *.DXF) as applicable to the specific document and meeting. While email is acceptable method to receive this information, note that the VA has a size restriction for attachments on email. No email can be sent or received by the VA that is larger than 5MB. If meeting presentation materials are larger than this size, the Contractor must determine an alternate method to submit the required materials by the due date (e.g. FTP website, optical digital media, etc ). Meeting Minutes The Contractor shall provide meeting minutes to document the discussion had during the meeting. The contents of meeting minutes shall include but is not limited to the following information/topics: Meeting attendees Narrative to describe contents of meeting (will likely mirror the meeting agenda) List of action items (for both the Government and the Contractor) Presentation materials used during the meeting should be included as enclosures Meeting minutes may be organized in Contractor specified format. Meeting minutes will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). The Contractor shall provide draft meeting minutes within 5 business days of the meeting. The Government will review and provide comments back to the Contractor within 3 business days of receipt of the draft meeting minutes. The Contractor shall finalize the meeting minutes and submit the final meeting minutes to the Government within 3 business days of receipt of Government comments. Construction The Contractors scope of work for Construction shall include, but is not limited to the following: Kick-off Meeting and Site Survey The Contractor shall conduct a kick-off meeting at the VAMC. During the kick-off meeting the Contractor shall address their plan to meet the design intent, review the schedule, and review their plan to address any risks associated with the effort. This meeting shall comply with the terms of Section 3.1.2 of this SOW. See section 5.2 for the timing of this meeting. In conjunction with the Kick-off Meeting, the Contractor shall survey the existing roof areas to assess current site conditions and assemble existing as-built documents. Site surveys shall be conducted in accordance with Section 1.5.2. Submittals In accordance with the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES (528-24-126), the contractor shall provide submittals and shop drawings for review prior to starting work. A submittal log will be generated for this effort that represents the required submittals based upon the current construction documents. Although every attempt has been made to ensure that this list is complete, additional submittals not listed may be required. Preconstruction Conference Once the submittals have been approved, the Contractor shall attend a Preconstruction Conference. This meeting will be a follow-up to the Kick-off Meeting and Site Survey. In preparation for this meeting the Contractor shall submit: An updated work plan that adds additional details based upon approved submittal information. Revised or new Activity Hazard Analysis (AHA) based on approved submittals Any additional clarifying details about the work to be performed that have been updated bases upon the approved submittals. Any action items resulting from this meeting shall be addressed prior to ordering any materials or beginning the actual construction work. This meeting shall comply with the terms of Section 3.1.2 of this SOW and the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 35 26 SAFETY REQUIREMENTS (528-24-126); Article titled Preconstruction Conference. See section 5.2 for the timing of this meeting. General Construction Work includes, but not limited to, all labor, material, equipment and supervision to perform the required demolition, modification, construction, and/or installation of the roofs and their subsystems as described in the drawings, specifications, and this SOW. Status Meetings The Contractor shall attend periodic status meetings with the VA to discuss construction progress, submittals, and RFIs during the project. Status meetings will commence after the Preconstruction Conference is held (section 3.2.3). Status meetings shall be held every two weeks for the remainder of the effort. At a minimum, status meeting attendees shall be the VAMC COR and one person from the prime Contractor. Additional personnel may be invited to the meeting as required. As part of the last status meeting, a resurvey of the site will be conducted (see PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, Section 01 00 00 (General Requirements - 528-24-126). The Contractor and/or Sub Contractor shall provide meeting minutes in accordance with the terms of Section 3.1.3. Verification Verification of the installed system(s) and associated appurtenance(s) shall be jointly conducted before acceptance of the final constructed product. The groups that will participate in the verification process include: Prime Contractor Subcontractor(s) VA Engineering VAMC third-party CETA agent This installation inspection will be based upon contract documents, USP 797, USP 800, VA manuals/guidelines, and will be checked against VA specifications and drawings as applicable. The installation shall meet or exceed manufacturers requirements for Certificate of Warranty. For any item that does not pass the verification test, the Contractor shall troubleshoot the issue and determine the FboNotice cause of the problem. If the FboNotice cause is the result of the construction work, the Contractor shall repair and/or replace the faulty construction work and any subsequently damaged equipment at no additional cost to the Government. If the FboNotice cause is the result of faulty equipment (manufacturer defect), the Contractor shall coordinate with the manufacturer to repair and/or replace the faulty product and any subsequently damaged equipment at no additional cost to the Government. Delivery Technical POC The Contractor shall coordinate all visits and meetings with and provide the required quantity of submittals to Michael Wik VA Western New York Healthcare System Buffalo VA Medical Center 3495 Bailey Avenue Buffalo, NY 14215 Phone: (716) 342-6165 Email: michael.wik@va.gov Schedule and Submittals Independent of the not to exceed period of performance, the Contractor shall comply with the individual relative and absolute timelines identified in this SOW. The Contractor is responsible for submitting a detailed schedule in accordance with PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 32 16.15, PROJECT SCHEDULES (528-24-126). This schedule must include all administrative work (preparatory as well as any permitting or shut down requests) and must also show associated predecessor and successor logic associated with all tasks performed under this contract. Government Furnished Information, Materials, & Equipment The government shall supply the following information: All Buffalo VAMC drawings and modified program guides and specifications from section 2.2. Government Furnished Materials (GFM) and Government Furnished Equipment (GFE) are not required and will not be provided for this effort.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/054495e96381402b925afece7d484044/view)
 
Record
SN07534627-F 20250806/250804230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.