Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 06, 2025 SAM #8654
SOLICITATION NOTICE

Z -- FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

Notice Date
8/4/2025 5:25:09 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR25BA006
 
Response Due
9/5/2025 9:00:00 AM
 
Archive Date
12/31/2025
 
Point of Contact
Gary Faykes, Phone: 4109620192
 
E-Mail Address
GARY.FAYKES@USACE.ARMY.MIL
(GARY.FAYKES@USACE.ARMY.MIL)
 
Description
The project consists of maintenance dredging approximately up to 2,300,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The dredging depth for all channels is between 35 and 50 feet mean lower low water (MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately up to 1,830,000 cy will be dredged from the Maryland approach channels (Brewerton Eastern Extension, Swan Point, Craighill and possibly Tolchester Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 500,000 cy will be dredged from Baltimore Harbor Channels (Brewerton, Brewerton Angle, and Seagirt West Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of one to two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed. THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 5 SEPT 25.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/717fe2663cae4239bc561be0869e7a61/view)
 
Place of Performance
Address: Baltimore MD 21201
Zip Code: 21201
 
Record
SN07535098-F 20250806/250804230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.