Loren Data's SAM Daily™

samdaily.us
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe

FBO#2975

N - Installation of Equipment

SOURCES SOUGHT - January 16, 2010


  • LP755 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY TOUCH UP REPAIR PROCESS ON ALUMINIDE CERAMIC COATINGS WITHOUT STRIPPING TO BARE METAL.
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP754 - Sources Sought
    OBTAIN INFORMATION REGARDING DESIGNING, ENGINEERING, INSTALLING, DEMONSTRATING, VALIDATING, QUALIFYING, AND ACTIVATING FULLY FUNCTIONAL, PRODUCTION READY LOW RADIOACTIVITY THERMAL BARRIER COATING FOR USE ON GAS TURBINE ENGINES AND COMPONENTS.
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP750 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY STRIPPING SOLUTION REMOVAL EQUIPMENT SYSTEM
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP751 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY MRO PROCESS TO REPAIR OR SALVAGE COMPONENTS TO THEIR ORIGINAL UNWORN OR ERODED DIMENSIONAL TOLERANCES OTHER THAN THROUGH WELDING, THERMAL SPRAY, BRAZING, OR HAZARDOUS CHEMICAL PLATING BATHS.
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP703 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY LOW RADIOACTIVITY THERMAL BARRIER COATING FOR USE ON GAS TURBINE ENGINES AND COMPONENTS.
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP708 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY LASER SHOCK PEENING SYSTEM.
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP706 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY GREEN ENVIRONMENTALLY ACCEPTABLE, NON-DAMAGING, COST EFFECTIVE METHOD OF INSPECTING FOR CRACKS/BURN-DAMAGE UNDER ADVANCED COATINGS WITHOUT REMOVING THE COATING AND LESSENING LIFE EXPECTANCY.
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP702 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY ADVANCED COATINGS REMOVAL SYSTEM FOR LARGE AND SMALL LANDING GEAR COMPONENTS. THE CRP NEEDS TO REDUCE FLOW TIME FROM DAYS TO HOURS, IS ENTIRELY “GREEN”, DOES NOT DAMAGE PARTS, REQUIRES ONLY A SINGLE OPERATOR,
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     
  • LP700 - Sources Sought
    INSTALL A FULLY FUNCTIONAL, PRODUCTION READY GREEN ENVIRONMENTALLY ACCEPTABLE, NON-DAMAGING, COST EFFECTIVE METHOD OF POWDER COATING LANDING GEAR COMPONENTS, WITH CAPABILITIES OF LOW TEMPERATURE CURE AND SUPERIOR PERFORMANCE OVER POLYURETHANE
    Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting)
     

This Issue's Index  |  Today's FBO Daily Index Page |
Created on 14-Jan-2010 by Loren Data Corp. -- info@fbodaily.com
What's the Hubbub at LD.com? ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.