Loren Data's SAM Daily™

samdaily.us
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe

FBO#3051

Y - Construction of Structures and Facilities

AWARDS - April 2, 2010


  • W9126G-10-C-0041 - $1,690,626.42
    RECOVERY--Y--PROJECT NUMBER 19920, WHITNEY LAKE, TX
    B. W. STRAYHORN COMPANY, INC. (054139977)<br> 925 E LINCOLN ST<br> WICHITA FALLS, TX 76306-3041
     
  • W912DW-10-C-0011 - $2,151,122.00
    RECOVERY--Y--PROJECT NUMBER 38942, REPAIR SMALL ARMS RANGE #105, PROJECT NUMBER 38945, REPAIR SMALL ARMS RANGE #106, PROJECT NUMBER 38947, REPAIR SMALL ARMS RANGE #107, PROJECT NUMBER 38948, REPAIR SMALL ARMS RANGE #108, PROJECT NUMBER (SEE DESC)
    WALSH, HEDLUND, AND HARLOW CONSTRUCTION, LLC (610185287)<br> 40 LAKE BELLEVUE DR<br> BELLEVUE, WA 98005-2479
     
  • VA261-RA-0827 - 1,857,100.00
    RECOVERY Y--RECOVERY ACT - DESIGN-BUILD REPLACE EMERGENCY POWER SYSTEMS MENLO PARK DIVISION, VA PALO ALTO HEALTH CARE SYSTEM, MENLO PARK, CALIFORNIA, SAN MATEO COUNTY.
    KADENA PACIFIC, INC.;3421 GATO CT STE A;RIVERSIDE;CA;925076819
     
  • L10PC00178 - $124214
    RECOVERY--Y-- SAN SIMON FENCE CONSTRUCTION
    PLS GROUP, INC.PO BOX 2900THATCHERAZ85552-2900US
     
  • VA261-RA-0826 - 1,818,100.00
    RECOVERY Y--RECOVERY ACT - DESIGN-BUILD REPLACE EMERGENCY POWER SYSTEMS PALO ALTO DIVISION, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CALIFORNIA, SANTA CLARA COUNTY.
    KADENA PACIFIC, INC.;3421 GATO CT STE A;RIVERSIDE;CA;925076819
     
  • VA261-RA-0825 - 1,952,527.00
    RECOVERY Y--RECOVERY ACT - DESIGN-BUILD REPLACE EMERGENCY POWER SYSTEMS LIVERMORE DIVISION, VA PALO ALTO HEALTH CARE SYSTEM, LIVERMORE, CALIFORNIA, ALAMEDA COUNTY.
    KADENA PACIFIC, INC.;3421 GATO CT STE A;RIVERSIDE;CA;925076819
     
  • W9126G-06-D-0047-0010 - $3,897,777.00
    RECOVERY--Y--PROJECT NUMBER 34288, REPAIR BLDG 4797 FITNESS CENTER--HVAC & RESURFACE FLOOR
    MBH VENTURES (616487174)<br> 427 W CEVALLOS<br> SAN ANTONIO, TX 78204-1610
     
  • DTFH71-10-C-00016 - $506,919.00
    RECOVERY, GEORGE WASHINGTON MEMORIAL PARKWAY DANGERFIELD ISLAND PRA-GWMP 200(1), 936(1)
    Finley Asphalt & Sealing, Inc, 9105 Industry Drive, Manassas Park, Virginia 20111-4807, United States
     
  • W9126G-09-D-0088 CL01 - $3,586,900.00
    RECOVERY--Y--PROJECT NUMBER 322926 FOREIGN SECURITY FORCES TRANSITION TEAM MISSION, FORT POLK, LOUISIANA
    THE ROSS GROUP CONSTRUCTION CORPORATION (967886425)<br> 1140 N 129TH E AVE<br> TULSA, OK 74116-1724
     
  • G10PD01226 - 340486
    RECOVERY- CONSTRUCT SINGLE FAMILY QUARTERS
    BLUESCOPE CONSTRUCTION, INC.,1540 GENESSEE ST ,KANSAS CITY MO 641021069
     
  • N6247310G5427 - 3,500,000
    8(A) BASIC ORDERING AGREEMENT
    Ahtna Engineering Services
     
  • W912DQ-10-C-4014 - $24,306,000.00
    ADVANCED WASTE WATER TREATMENT PLANT (WWTP) - FORT RILEY, KANSAS
    JOSEPH J. HENDERSON AND SON, INC (002980746)<br> 4288 OLD GRAND AVE<br> GURNEE, IL 60031-2734
     
  • C3700090042 - 133034
    RECOVERY - REPLACE WINDOWS AND DOORS AT CABIN CAMP TO IMPROVE ENERGY EFFICIENCY - PRWI, PMIS 153908
    PARTNERS BUILDING HOMES,17017 DUMFRIES RD ,DUMFRIES VA 220251927
     
  • N40085-07-D-7022 CTO 0003 - $15,218,200
    P837 DESIGN/BUILD C-40 AIRCRAFT MAINTENANCE HANGAR, NAS OCEANA, VIRGINIA BEACH, VA
    HOURIGAN CONSTRUCTION CORP. (DUNS 041446451)4429 Bonney Road, Suite 200Virginia Beach, VA 23462
     
  • W912DQ-07-D-0046-DK01 - $548,127.00
    RECOVERY--Y--PROJECT NUMBER 72869, GROUND SOURCE HEAT PUMPS & PHOTOVOLTAIC FOR BLDG 100-101
    CAMAN CONSTRUCTION COMPANY INC 8 (A)/ STRICKLAND CONSTRUCTION CO INC A MISSOURI JV (792749843)<br> 5004 BRIGHTON AVE<br> KANSAS CITY, MO 64130-0000
     
  • VA528-C-0729 - 30,062.08
    MARQUEE SIGN INSTALLATION AND PREPARATION
    NORTHERN DREAMS CONSTRUCTION, INC.;42 LACKAWANNA AVE;BUFFALO;NY;142122105
     
  • W912HY-10-C-0011 - $837,733.30
    RECOVERY--Y--GIWW - TEXAS VARIOUS LOCATIONS FLOATING ANVIL MOORING SYSTEMS
    TRUSTON TECHNOLOGIES, INC.<BR>102 RUE DU PAIN<BR>BROUSSARD, LA 70518
     
  • VA101CFM-C-0080 - 7,497,451.00
    DESIGN-BUILD INFORMATION TECHNOLOGY (IT)BUILDING, OLIN E. TEAGUE VA MEDICAL CENTER, TEMPLE, TX
    INTEGRATED PRO SERVICES, LLC;2701 GENERAL DE GAULLE DR;NEW ORLEANS;LA;701146222
     
  • N40085-10-C-9443 - 5,489,900
    199
    Maron Construction Company, Inc. (DUNS 080810062)180 Buttonhole DriveProvidence, RI 02940
     
  • VA261-RA-0823 - 1,033,837.00
    RECOVERY Y--RECOVERY ACT: SEWER LIFT STATION, VA, NCHCS, MATHER PARK, SACRAMENTO COUNTY, CA
    TOTAL TEAM CONSTRUCTION SERVICES, INC;2510 BOATMAN AVE STE B;WEST SACRAMENTO;CA;956913816
     
  • VA248-RA-1374 - 195,000.00
    RECOVERY Y--RECOVERY ACT - INSTALL OXYGEN SYSTEM AT COMMUNITY LIVING CENTER(CLC), 2ND FLOOR, WARD B, VA CARIBBEAN HEALTHCARE SYSTEM (VACHS), SAN JUAN, PR
    SAN DIEGO PROJECT MANAGEMENT PSC;166 CALLE CARRETA OESTE;LUQUILLO;PR;007733015
     
  • VA528-RA-0731 - 1,215,320.00
    RECOVERY Y--RECOVERY - REPLACE EXISTING CHILLERS (CONSTRUCTION)
    DIVERSE CONSTRUCTION GROUP, LLC, THE;25968 STATE ROUTE 26;PLESSIS;NY;136752227
     
  • W912DQ-10-C-4013 - $3,627,195.00
    RECOVERY--Y--PROJECT NUMBER 38836, RENOVATE BUILDING 219 DES
    FRONTIER-ARROWHEAD JOINT VENTURE, LLC (800012986)<br> 1308 N 14TH ST<br> INDIANOLA, IA 50125-1509
     
  • 50181RC027 - 7326356
    RECOVERY-FFS PROJECT #R5BA TAS 14-1613 2009/2010 CONSTRUCTION OF A NEW ADMINISTRATION/VISITOR CENTER FACILITY
    T.G. NICKEL & ASSOCIATES, LLC,22 COLT CT ,RONKONKOMA NY 117796948
     
  • AG-9702-D-10-0094 - 118872
    RECOVERY - SAFFEL CANYON TRAIL SYSTEM CONSTRUCTION OF EROSION CONTROL STRUCTURES AND SPOT SURFACING
    Highland Trucking, P.O. Box 278, Springerville, Arizona 85938-0278, United States
     
  • W912EQ-10-C-0013 - $3,630,964.00
    RECOVERY--Y--017320, SELECTIVE CATALYTIC REDUCTION SYSTEM AT HUXTABLE PUMPING PLANT
    MIRATECH CORPORATION (803089002)<br> 4224 S 76TH EAST AVE<br> TULSA, OK 74145-4712
     
  • W912DW-10-C-0010 - $4,882,200.00
    RECOVERY--Y--PROJECT NUMBER 34148, REPAIR HEAT DISTRIBUTION PIPING 3100 BLOCK
    MTM CONTRACTORS, INC. (130136385)<br> 24 N STONE ST<br> SPOKANE, WA 99202-3967
     
  • VA263-RA-0880 - 168,800.00
    RECOVERY Y--RECOVERY ACT REPLACE/REPAIR STEPS FOR BUILDING 3, 636A6-09-120
    MIDWEST CONTRACTING, INC.;8719 S 135TH ST STE 200;OMAHA;NE;681386522
     
  • W91278-07-D-0070-0010 - $3,074,113.00
    RECOVERY--Y--PROJECT NUMBER 087, REPAIR HVAC SYSTEM IN LAB BUILDING 511 - WALTER REED ARMY INSTITUTE OF RESEARCH , FOREST GLEN, MD.
    DMCA, INC. (928472745)<br> 2110 W DIVISION ST<br> ARLINGTON, TX 76012-3662
     
  • GS-11P-05-MKC-0036--PC68 - Not to Exceed $4,759,926.46
    RECOVERY ACT - SWITZER SITE GREENING (HPGB) IMPROVEMENTS
    Grunley Construction Co., Inc., 15020 Shady Grove Rd Ste 500, Rockville, Maryland 20850, United States
     
  • GS-11P-05-MKC-0036--PC67 - $7,897,674.84
    RECOVERY ACT - HPGB UPGRADES AND REPLACEMENTS
    Grunley Construction Co., Inc., 15020 Shady Grove Rd Ste 500, Rockville, Maryland 20850, United States
     
  • VA786A-RA-0282 - 159,689.19
    RECOVERY Y--R-CSD-137-SL01 JBNC CONSTRUCTION: REPLACE CHAPEL SIDING REPAIR BUILDINGS AND OTHER CEMETERY INFRASTRUCTURE. JEFFERSON BARRACKS NATIONAL CEMETERY, MO
    MCUT CONSTRUCTION & ENGINEERING MANAGEMENT LLC;122 CLOVERDALE LN;SCHAUMBURG;IL;601943957
     
  • C157410A040 - 822000
    RECOVERYTAS::14 1041::TAS, YELL PMIS # 20115CONSTRUCTION OF A MICRO-HYDROELECTRIC PLANT
    DICK ANDERSON CONSTRUCTION, INC.,3424 E US HWY 12 ,HELENA MT 596019708
     
  • W9128F-10-M-G011 - $38,720.00
    SPILLWAY EXPANSION JOINT SEALS FOR THE US ARMY CORPS OF ENGINEERS, GAVINS POINT PROJECT LOCATED NEAR YANKTON, SD: POC BRYAN BRADLEY @ 402-667-2560
    NORTHWEST CONCRETE CUTTING CORP (104330084)<br> 1001 E 52ND ST N<br> SIOUX FALLS, SD 57104-0637
     
  • W91278-07-D-0070-0012 - $2,718,432.00
    RECOVERY--Y--PROJECT NUMBER 004, REPLACE ALL AHU, DAMPERS, & BAL SYS - US ARMY AEROMEDICAL RESEARCH LABORATORY , FORT RUCKER, AL.
    DMCA, INC. (928472745)<br> 2110 W DIVISION ST<br> ARLINGTON, TX 76012-3662
     
  • L10PC00175 - $80028
    RECOVERY--Y--VIRGIN RIVER CANYON CAMPGROUND ACCESSIBIL
    JNJ ENGINEERING CONSTRUCTION, INC.POST OFFICE BOX 842218HILDALEUT84784-2218US
     
  • W912EE-10-C-0011 - $5,119,240.00
    RECOVERY--Y--PROJECT NUMBER 107166, LEASE OF CUTTERHEAD HYDRAULIC PIPELINE DREDGE FOR CONSTRUCTION AND MAINTENANCE DREDGING WITHIN THE VICKSBURG AND ADJACENT DISTRICTS
    L. W. MATTESON, INC (073496846)<br> 1 SOUTH PT<br> BURLINGTON, IA 52601-6066
     
  • AG-9702-D-10-0092 - 133400.45
    RECOVERY - RIM VISTA TRAIL PAVING - MOBILITY DISABILITY ACCESSIBILITY
    V Mountain Construction, 5898 Webbville Rd, Lakeside, Arizona 85929-0485, United States
     
  • 60181RC030 - 150280
    PHOTOVOLTAIC AND WIND TURBINE, BROWNS PARK NATIONAL WILDLIFE REFUGE, MOFFAT COUNTY, COLORADO, FFS PROJECT NUMBER: R6JA, TAS::14 1610::TAS
    SUN SPOT SOLAR, LLC,23434 WAYNES WAY ,GOLDEN CO 804019155
     
  • 60181RC019 - 145765
    PHOTOVOLTAIC AND ENERGY SYSTEMS, ARAPAHOE NATIONAL WILDLIFE REFUGE, JACKSON COUNTY, COLORADO, FFS PROJECT NUMBER: R6JA, TAS::14 1610::TAS
    HYDRO ELECTRIC LLC,2912 2ND ST ,BELLVUE CO 805120206
     
  • W912QR-10-C-0044 - $2,127,000.00
    RECOVERY--Y--PROJECT NUMBER 112551, RESIDENT ENGINEERING BUILDING AT JT MYERS LOCK AND DAM, MOUNT VERNON, IN.
    ARC CONSTRUCTION CO., INC. (047541198)<br> 1745 S KENTUCKY AVE<br> EVANSVILLE, IN 47714-3411
     
  • W9126G-09-D-0034-0008 - $6,097,777.00
    RECOVERY--Y--PROJECT NUMBER 25295, BARRACKS BLDG 904-- REPLACE HVAC, PLUMBING, ELECTRIC, FINISHES, PROJECT NUMBER 38887, DESIGN / CONSTRUCT LAUNDRY ROOM ADDITION TO BARRACKS 904 PROJECT #38887 DESIGN/CONSTRUCT LAUNDRY ROOM ADDITION TO (SEE DESC)
    MAPCO, INC. (807474044)<br> 427 W CEVALLOS<br> SAN ANTONIO, TX 78204-1610
     
  • VA248-C-1414 - 32,856.00
    REPLACE ESSENTIAL STEAM PIPES IN "OLD CHILLER" PLANT
    ALE GROUP INC;8100 SANCTUARY DR # 1;NAPLES;FL;341045861
     
  • C2011101029 - 3849072
    RECOVERY SEKI PMIS# 059925 TAS::14 1041::TASREPLACE POTABLE WATER TANKS AND ASSOCIATED INFRASTRUCTURE AT THE ASH MOUNTAIN ENTRANCE TO SEQUOIA NATIONAL PARK. ERICK AMMON INC. 960252930
    ERICK AMMON INC,560 SALYER LOOP RD ,SALYER CA 955630531
     
  • GS-07F-0224N VARA549-C01073 - 1,149,551.00
    RECOVERY Y--RECOVERY ACT PROJECT - R549-09-900 PATIENT CARE AREA ROOF REPLACEMENT
    ALLIANCE ROOFING LLC;28 COMMERCE ST;GLASTONBURY;CT;060332364
     
  • AG-4419-C-10-0287 - $62,300.00
    RECOVERY: SOLAR POWERED WATER SUPPLY SYSTEMS, SUPERIOR NATIONAL FOREST
    TAC Construction Solutions, 31767 Deacons Way, Pequot Lakes, Minnesota 56472, United States
     
  • GS-01P-09-BZ-C-0023 - $28,548,493
    RECOVERY WINDOW REPLACEMENT PROJECT AT JOHN F KENNEDY BUILDING, BOSTON MA
    Alutiiq Manufacturing Contractors LLC, 101 Quality Circle, Huntsville, Alabama 35806, United States
     
  • 40181RC010 - 1148357
    RECOVERY, TAS::14 1610::TAS, PROJECT NUMBERS 4143 R4MN, 4151 R4PA, AND 4141 R4PB, REPLACE WATER CONTROL STRUCTURES AND REHAB PONDS
    SPECPRO ENVIRONMENTAL SERVICES LLC,1006 FLOYD CULLER CT ,OAK RIDGE TN 378308022
     

This Issue's Index  |  Today's FBO Daily Index Page |
Created on 01-Apr-2010 by Loren Data Corp. -- info@fbodaily.com
What's the Hubbub at LD.com? ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.