COMMERCE BUSINESS DAILY ISSUE OF MAY 25,1999 PSA#2353United States Air Force, Air Force Materiel Command, AAC -- Air
Armament Center, AAC/PK, 205 West D Avenue, Suite 433, Eglin AFB, FL,
32542-6862 Z -- UPGRADE HVAC & ELECTRICAL, GUN TEST FACILITY BLDG 410, EGLIN AFB
SOL F08651-99-R-0096 DUE 071699 POC Sherrye Driscoll, Contract
Specialist, Phone (850)882-5628 x 5270, Fax (850) 882-1014, Email
driscoll@eglin.af.mil -- Sheila Kingman, Contract Specialist, Phone
(850)882-5628 x 5274, Email kingman@eglin.af.mil WEB: Visit this URL
for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F08651-99-R-0
096&LocID=1182. E-MAIL: Sherrye Driscoll, driscoll@eglin.af.mil. Eglin
AFB has a requirement for Upgrade HVAC & Electrical, Gun Test Facility
Bldg 410, Eglin AFB FL. This project includes furnishing all plant,
labor, equipment, and materials to Upgrade HVAC & Electrical, Gun Test
Facility Bldg 410, Eglin AFB FL. This is a "Trade-Off" Contract. Award
will be made based upon the "Best Value" to the Government in
accordance with FAR 15.3. The Government reserves the right to award a
contract to other than the low proposed price. In general, the work
shall consist of the following: An asbestos phase for boiler and pipe
insulation; Demolition of an existing steam boiler and its associated
piping, controls, and other system components; Demolition of unit
heaters, air handling units and ductwork, and related items; A new HVAC
system to include air handling units with heating and cooling coils,
new ductwork and accessories; A new hot water boiler for heating;
Providing a new air-cooled chiller; All associated piping, related
components, and direct digital controls for the systems; The existing
air-cooled chiller is to be evacuated and sealed and turned over to the
Government; The electrical work will be primarily for the removal of
multiple electrical services to the building and combining them into a
single service; Other electrical work related to the removal and
replacement of the HVAC systems. The facility will be occupied and will
remain in operation during the construction, so there will be a phasing
plan for the construction. The above general description of work does
not in any way limit the responsibility of the contractor to perform
all work and furnish all plant, labor, equipment and materials complete
in accordance with the specifications. Proposal closing of 16 JUL 1999
IS ONLY AN ESTIMATED DATE. Estimated dollar range is between
$500,000.00 and $1,000,000.00. All responsible sources may submit a
proposal, which shall be considered by the agency. Firms responding
should indicate if they are a small business. Paper copies of the
solicitation will not be issued, but the Request for Proposal (RFP)
will be available on the Federal Government's Electronic Posting
System) (www.eps.gov). See Note 26. Posted 05/21/99 (D-SN334264).