|
COMMERCE BUSINESS DAILY ISSUE OF JULY 13,1999 PSA#2386United States Air Force, Air Force Materiel Command, AAC -- Air
Armament Center, AAC/PK, 205 West D Avenue, Suite 433, Eglin AFB, FL,
32542-6862 Z -- UPGRADE HVAC BUILDING 1328, EGLIN AFB LF SOL F08651-99-R-0095 DUE
080299 POC Bertha Burns, Contract Specialist, Phone (850)882-5628 x
5268, Fax (850)882-1014, Email burnsb@eglin.af.mil -- Sheila Kingman,
Contract Specialist, Phone (850)882-5628 x 5274, Email
kingman@eglin.af.mil WEB: Visit this URL for the latest information
about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F08651-99-R-0
095&LocID=1182. E-MAIL: Bertha Burns, burnsb@eglin.af.mil. Eglin AFB
has a requirement to Upgrade HVAC Building 1328, Eglin AFB FL. THIS IS
A "TRADE-OFF" (PERFORMANCE PRICE TRADE-OFF) ACQUISITION. Award will be
made based upon the "Best Value" to the Government in accordance 15.3.
The Government reserves the right to award to award a contract to
other than the lowest proposed price. This project includes furnishing
all plant, labor, equipment, and materials and performing all
operations in connection with upgrading the HVAC equipment and the fire
alarm system at Building 1328, Eglin AFB FL. In general, this project
is primarily for the repair of, and additions to, the HVAC systems in
building 1328. Some minor duct and hot water coil changes will be
required. Also, some minor carpentry and masonry work is included. Two
existing air handling units located on the exterior of the building
are to be enclosed so that the areas around the units become mechanical
rooms. Two air handling units in a penthouse on top of the building are
to have their return air dampers replaced. A backup direct expansion
air conditioning system is to be added for one area of the building. A
new direct digital control system is to be provided for all of the
HVAC equipment. All of the air systems are to be balanced. The existing
fire alarm system for the building is to be replaced. Proposal due date
of 16 August 1999 IS ONLY AN ESTIMATED DATE. Estimated dollar range is
between $100,000 and $250,000. NOTE: Funds are not presently available
for this project. No award will be made until funds are available to
make payments under a contract. The Government reserves the right to
cancel this solicitation, either before or after RFP closing, with no
obligation to the offeror by the Government. Performance period is 120
calendar days. All responsible sources may submit a proposal, which
shall be considered by the agency. Firms responding should indicate if
they are interested in this project as a prime or subcontractor;
contractors must reply either by facsimile at (850) 882-9441, attention
to Ms. Lana Wallace or by email, boylel@eglin.af.mil. This is a
paperless acquisition. Paper copies of the solicitation will not be
issued but the Request for Proposal will be available on the Federal
Government's Electronic Posting System (www.eps.gov)and on the Eglin
Home Page at "Contracting Opportunities," (eglinpk.eglin.af.mil) Base
Level Contracting. Click on the file name listed for this project under
construction projects. Posted 07/09/99 (D-SN352460). (0190) Loren Data Corp. http://www.ld.com (SYN# 0186 19990713\Z-0018.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|