|
COMMERCE BUSINESS DAILY ISSUE OF JULY 22,1999 PSA#2393Department of the Air Force, Air Force Materiel Command, AAC -- Air
Armament Center, AAC/PK, 205 West D Avenue, Suite 433, Eglin AFB, FL,
32542-6862 Z -- UPGRADE HVAC BUILDING 1328, EGLIN AFB LF SOL F08651-99-R-0095 DUE
082099 POC Bertha Burns, Contract Specialist, Phone (850)882-5628 x
5268, Fax (850)882-1014, Email burnsb@eglin.af.mil -- Sheila Kingman,
Contract Specialist, Phone (850)882-5628 x 5274, Email
kingman@eglin.af.mil WEB: Visit this URL for the latest information
about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=M&ProjID=F08651-99-R-0
095&LocID=1182. E-MAIL: Bertha Burns, burnsb@eglin.af.mil.
Reponse/Proposal due date changed to 20 August 1999. Eglin AFB FL has
a requirement to Upgrade HVAC Building 1328, Eglin AFB FL. THIS IS A
"TRADE-OFF" (PERFORMANCE PRICE TRADE-OFF) ACQUISITION. Award will be
made based upon the "Best Value" to the Government in accordance 15.3.
The Government reserves the right to award to award a contract to
other than the lowest proposed price. This project includes furnishing
all plant, labor, equipment, and materials and performing all
operations in connection with upgrading the HVAC equipment and the fire
alarm system at Building 1328, Eglin AFB FL. In general, the work
consist of replacing two chiller water air handling units and
associated hot water reheat coils, enclosing the existing lean-to
covers for these units, replacing the outside air/return air dampers on
two existing penthouse air handling units, retrofitting the penthouse
air handling units with DDC controls, resetting the outside air
quantities on the penthouse units, adding a backup direct expansionair
conditioning unit for the PMEL lab, balancing all air handling units,
and replacing the fire alarm system for the building. Proposal due
date of 2 August 1999 IS ONLY AN ESTIMATED DATE. Estimated dollar range
is between $100,000 and $250,000. NOTE: Funds are not presently
available for this project. No award will be made until funds are
available to make payments under a contract. The Government reserves
the right to cancel this solicitation, either before or after RFP
closing, with no obligation to the offeror by the Government.
Performance period is 120 calendar days. All responsible sources may
submit a proposal, which shall be considered by the agency. Firms
responding should indicate if they are interested in this project as a
prime or subcontractor; contractors must reply either by facsimile at
(850) 882-9441, attention to Ms. Lana Wallace or by email,
boyle@eglin.af.mil. This is a paperless acquisition. Paper copies of
the solicitation will not be issued but the Request for Proposal will
be available on the Federal Government's Electronic Posting System
(www.eps.gov)and on the Eglin Home Page at "Contracting Opportunities,"
(eglinpk.eglin.af.mil) Base Level Contracting. Click on the file name
listed for this project under construction projects. Posted 07/20/99
(D-SN356747). (0201) Loren Data Corp. http://www.ld.com (SYN# 0209 19990722\Z-0037.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|