Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 10,2000 PSA#2512

Department of the Air Force, Air Force Materiel Command, AAC -- Air Armament Center, AAC/PK, 205 West D Avenue, Suite 433, Eglin AFB, FL, 32542-6864

Z -- REPAIR SEAWALL, CAMP PINCHOT, EGLIN AFB FL SOL F08651-00-Q-0233 DUE 022800 POC Bertha Burns, Contract Specialist, Phone (850)882-5628 x 5268, Fax (850)882-1014, Email burnsb@eglin.af.mil -- Sheila Kingman, Contract Specialist, Phone (850)882-5628 x 5274, Email kingman@eglin.af.mil WEB: Visit this URL for the latest information about this, http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F08651-00-Q-0 233&LocID=1182. E-MAIL: Bertha Burns, burnsb@eglin.af.mil. Eglin AFB has a requirement to Repair Seawall, Camp Pinchot, Eglin AFB FL. This project includes furnishing all plant, labor, equipment, and materials and performing all operations in connection with installing a new seawall at Camp Pinchot, Eglin AFB FL. The existing seawall shall be cut and removed. The seawall shall be cut at a maximum height of 8 inches above the low tide water surface. The entire seawall from the cut upward shall be removed and disposed of properly off Government property. The remainder of the seawall shall be abandoned in place, and shall not interfere with the installation of the new seawall. The contractor shall have only 100 feet of seawall removed at a time. The new seawall shall consist of interlocking vinyl sheet piles, 8 feet in length, driven at least 4 feet deep, leaving at most 4 feet exposed. The height of the new seawall shall match the height of the existing seawall. The front (waterside) face of the new seawall shall be no more than 1 foot in front of the existing seawall face. The New Seawall shall be tired to round timber piles. The seawall shall consist of a single wale, both front and back, and shall be wood capped. After installation of seawall, backfill shall be placed to the top of the seawall. Sod shall be placed on areas of new construction. The work shall be located at Camp Pinchot, Eglin AFB FL. Quotes due date of 28 February 2000 IS ONLY AN ESTIMATED DATE. Estimated dollar range is between $25,000 and $100,000. Performance period is 90 calendar days. All responsible sources may submit a proposal, which shall be considered by the agency. Firms responding should indicate if they are interested in this project as a prime or subcontractor; contractors must reply either by facsimile at (850) 882-9441, attention to Ms. Lana Wallace or by email, boyle@eglin.af.mil. This is a paperless acquisition. Paper copies of the solicitation will not be issued but the Request for Proposal will be available on the Federal Government's Electronic Posting System (www.eps.gov) andon the Eglin Home Page at "Contracting Opportunities," (eglinpk.eglin.af.mil) Base Level Contracting. Click on the file name listed for this project under construction projects. See Note 26. Posted 01/06/00 (D-SN413884). (0006)

Loren Data Corp. http://www.ld.com (SYN# 0143 20000110\Z-0016.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page