|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 16,2000 PSA#2623Department of the Air Force, Air Force Materiel Command, AAC -- Air
Armament Center, AAC/PK, 205 West D Avenue, Suite 433, Eglin AFB, FL,
32542-6864 Z -- CONSTRUCT STORAGE FACILITY, BUILDING 1343, EGLIN AFB, FL SOL
F08651-00-Q0247 DUE 081500 POC Lillie Loggins, Contract Specialist,
Phone (850)882-5628 x 5271, Fax (850)882-9442, Email
loggins@eglin.af.mil -- Sheila Kingman, Contract Specialist, Phone
(850)882-5628 x 5274, Email kingman@eglin.af.mil WEB: Visit this URL
for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F08651-00-Q02
47&LocID=1182. E-MAIL: Lillie Loggins, loggins@eglin.af.mil.
Description: Eglin AFB FL, has a requirement for the construction of an
80-foot by 30 foot, pre-engineered, addition on one side of Hangar 343,
the work will be performed at Eglin AFB, Okaloosa County, Florida.
"THIS IS A TRADE OFF" (PERFORMANCE PRICE TRADE-OFF) ACQUISITION. Award
will be made based upon "Best Value" to the Government in accordance
with FAR 15.3. The Government reserves the right to award a contract to
other than the lowest proposed price. "This project includes furnishing
all plant; labor, equipment and materials to remove or alter
construction to an 80 foot by 30 foot pre-engineered, addition on one
side of Hangar 1343. This facility will be used as a storage facility
for aircraft cargo pallets, cargo straps and nets, pallet bags and
other mobility equipment. In general work consists of constructing an
open area with no interior walls, although chain link fences will
divide the space into three areas, each with its own overhead door for
vehicle access. The space will be heated and ventilated, and will be
protected by a sprinkler system. Lighting and receptacle will be
provided and the space will be connected to the building fire alarm
system. The lump sum contract price shall include the cost of
performing the work as shown on the drawing and as specified hereafter.
The estimated dollar range is between $100,000.00 and $250,000.00. The
bid acceptance period is 120 days. All responsible sources may submit
a proposal, which shall be considered by the Agency. The above general
description of work does not in any way limit the responsibility of the
contractor to perform all work and furnish all plant, labor, equipment,
and materials complete in accordance with the plans and specifications.
The Proposal due date of 16 Aug 00 IS AN ESTIMATED DATE. All
responsible sources may submit a proposal, which shall be considered by
the agency. No response to this notice is necessary and no source list
shall be maintained. Paper copies of this solicitation will not be
issued, but the Request for Proposal(RFP) will be available on the
Federal Government's Electronic Posting system (www.eps.gov.). See Note
26 Posted 06/14/00 (D-SN464639). (0166) Loren Data Corp. http://www.ld.com (SYN# 0156 20000616\Z-0026.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|