|
|
|
Y - Construction of Structures and Facilities
SOLICITATIONS
- Y--CONSTRUCTION OF A TWO-STORY ADDITION TO AN EXISTING
- WILLISTON SUBSTATION, STAGE 06; WILLISTON COUNTY,
- CONSTRUCTION OF NEW PIERS, U. S. COAST GUARD STATION,
- VERTICAL BARRIER SCREENS, MCNARY DAM, UMATILLA COUNTY,
- CONSTRUCT AN OIL SPILL RESPONSE FACILITY AT USCG
- RONDOUT CREEK BASIN, NORTH ELLENVILLE REPAIR AND
- UTILITIES RECONFIGURATION-PHASE III AT THE
- REVITALIZE BUILDING 1208W
- PRE SYNOPSIS - DRMO ASPHALT REPAIR
- CONSTRUCT MULTI ROOM TEST STRUCTURES, EGLIN AFB FL
- FENCE CONSTRUCTION AT FORT PECK LAKE, FORT PECK,
- CONSTRUCT FULL ACCUMULATION POINT, SHAW AFB, SC
- JOINT STARS EXPANDED FLIGHT KITCHEN ROBINS AIR FORCE
- JOINT STARS DORMITORY, ROBINS AIR FORCE BASE, GEORIGA
- LAKE MONTAUK HARBOR, JETTY REHABILITATION, LONG
- REPLACING ROOFS AT THE VERTICAL PROCESSING FACILITY
- PRE-SOLICITATION - REPLACING ROOFS AT THE VERTICAL
- CONSTRUCTION-REPAIR OF AIR CONDITIONING
- PREQUALIFICATION FOR GENERAL DESIGN/BUILD CONTRACTORS
- DESIGN AND CONSTRUCTION OF FOUR ABOVE-GROUND PACKAGE
- DESIGN/BUILD CONSTRUCTION
Today's CBD Index Page
Created on September 29, 1996 by Loren Data Corp. --
info@ld.com
|
|
|