|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- INSTALL METAL FLASHINGS.
- CROSS CONNECTION CONTROL AND BACK FLOW PREVENTION PHASE
- REPLACE/REPAIR STEAM HEATING SYSTEM IN BOILER PLANT
- MAINTENANCE, REPAIR, AND ALTERATION OF REAL PROPERTY
- CHILLER PLANT DEMOLITION
- CORRECT HVAC DEFICIENCIES (ADMINISTRATIVE BUILDING) --
- RENOVATIONS TO QUARTERS #3
- RENOVATE RADAR APPROACH CONTROL (RAPCON), BUILDING
- VEHICLE PARKING ENCLOSURE -- ALBANY, NY PROCESSING &
- ROOF REPLACEMENT
- REPLACE MECHANICAL UTILITIES FROM MANHOLE #3 TO
- REPLACE RAILROAD TRACKAGE AT CREIGTON STREET,
- INSTALL VENTILATION AND UTILITIES FOR RUBBER LAB
- RENOVATE BUILDINGS 170 AND 174 FOR TELEPHONE ROOMS,
- FY97 HOUSING PROJECT R-110, ENTRANCE IMPROVEMENTS FOR
- MODIFY ELEVATOR S-2 FOR REFURBISH AMBULATORY CARE,
- DRAINAGE MAINTENANCE
- PROVIDE AND INSTALL NEW SEWER PIPELINE AT THE SEATUCK
- EARTHWORK TO REGRADE AND LINE EXISTING POND. CONCRETE
- SOUTHEAST RETAIL STORE, SPRINGFIELD, MO, 95801-9998
- LEASE OF ONE CUTTERHEAD HYDRAULIC PIPELINE DREDGE,
- REROOFING AND REPAIR OF ROOFS AT FORT LEWIS,
- FURNISH AND INSTALL SHOWER VALVE BOXES IN BLDG 5422 AT
- FURNISH AND INSTALL SHOWER VALVE BAX ASSEMBLIES IN
- REROOF B. 513 AT THE PUGET SOUND NAVAL SHIPYARD,
- REPLACE HEATING AND A/C SYSTEM, BLDGS. 3 & 6, NAVAL
- STRIP, PRIME AND REPAINT FOUR STORAGE TANKS, NAVAL AIR
- INSTALL GAS LINES TO MAYNARD AND HOUSING AND CONVERT
Today's CBD Index Page
Created on February 10, 1997 by Loren Data Corp. --
info@ld.com
|
|
|