|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- CONSOLIDATED POL PROJECTS AT HICKAM AIR FORCE BASE,
- REHABILITATE UTILITIES TO PROTECT CAVE, WIND CAVE
- REPLACE STEAM LINES -- MULTI-FACILITIES
- SIDING REPLACEMENT ON SIX TOWNHOUSES AT U.S. COAST
- RENOVATE SRT TO OUTDOOR RECREATION
- PAVE PARKING LOT, ANCHORAGE FEDERAL BUILDING, 7TH
- RENOVATION TO BARRACKS AT NTTC CORRY STATION,
- REPLACE ROOF, BELLINGHAM FEDERAL BUILDING, BELLINGHAM,
- MODIFICATION OF THE B-2 TEST STAND FOR CBC STATIC TEST
- REPAIR ROOF, BUILDING NO. 25, MAIN HANGAR, MONTANA AIR
- REPAIR CONCRETE
- REPLACE HVAC SYSTEM & RENOVATE THE PHOTO LAB IN
- REHABILITATION OF VISITOR CONTACT STATION
- DEMOLITION AND RECONSTRUCTION OF BRIDGE
- REPLACING METAL SIDING, BUILDING 440 (CLIMATIC
- PROVIDE CANOPY OVER COURT YARD AREA OF BUILDING 01395
- RENOVATION TO BARRACKS AT NTTC CORRY STATION,
- EXTERIOR PAINTING AT BEALE AFB, CA. PROJECT INCLUDES,
- AMENDMENT TO SOLICITATION NOTICE IB945099004
- REPAIR TAXIWAY G (PARALLEL), LAUGHLIN AFB, TX
- INSTALL OVERHEAD LIFE LINE
- AIRFIELD APRON JOINT RESEALING
- REPAIR/UPGRADE MRL FACILITY 54915, CCAS FL
- INSTALL COMMUNICATION EQUIPMENT, FORT STEWART, GEORGIA
- INSTALLATION OF UNDERGROUND FIBER OPTIC CABLE AND
- INSTALL BACKFLOW DEVICES PHASE 7, EGLIN AFB FL
- INSTALL NATURAL GAS METERS
- INDEFINITE QUANTITY CONTRACT
- GUNNISON OFFICE ROOF REPAIR
- WIEBE TRAIL RESTORATION
- GUNNISON OFFICE ROOF REPAIR
- VALVE REPLACEMENT AND MISCELLANEOUS CONSTRUCTION
- RENOVATION OF FEDERAL OFFICE BUILDING #2 FOR BALLISTIC
- REPAIRING MSA ROADS PHASE III
- WASH/SEAL EXTERIOR CONCRETE WALL, JACKSON FEDERAL
- AIR DISTRIBUTION CORRECTIONS
- INTERIOR AND EXTERIOR PAINT/REPAIR AND MAINTENANCE FOR
Today's CBD Index Page
Created on May 24, 1999 by Loren Data Corp. --
info@ld.com
|
|
|